Upgrade of the existing State Highway 1 - South corridor between Fairwater Road and the southern rural urban boundary to an urban arterial corridor with walking and cycling facilities. 

This project includes:

  • Widening and upgrading of State Highway 1 to an urban arterial cross section including cycle lanes and footpaths.  
  • Tie-ins with existing roads and localised widening around the existing intersections to accommodate new intersection forms.  
  • New or upgraded stormwater management systems, bridges and culverts (where applicable).  
  • Batter slopes to enable widening of the corridor, and associated cut and fill activities (earthworks).  
  • Vegetation removal.  

  • Other construction related activities required outside the permanent corridor including the re-grade of driveways, construction traffic manoeuvring and construction laydown areas 

Designation Maps

Project status and anticipated construction timeframes

This project is confirmed and operative in the Auckland Unitary Plan. The designation number that can be used to identify this project is: 1485. 

There is currently no funding for detailed design or construction of this project. We anticipate the project will be delivered sometime within the next 30 years in line with Auckland Council's land release strategy. 

Infographic showing the timeline for the project and status of where the project currently is

Information about the designation

Conditions on the designation

There are conditions on the designation which can be viewed in Chapter K of the Unitary Plan.

Alternatively, you can download a copy of the conditions.