Project overview
Sandspit Link is a proposed arterial connection linking Matakana Road and Sandspit Road, within the future urban growth areas in the northeast of Warkworth.
This project includes:
- Construction of a new urban arterial corridor with active mode facilities between the Matakana Road and Te Honohono ki Tai intersection and Sandspit Road.
- Tie-ins with existing roads and localised widening around the existing intersections to accommodate new intersection forms.
- New or upgraded stormwater management systems, bridges and culverts (where applicable).
- Batter slopes, and associated cut and fill (earthworks).
- Vegetation removal.
- Other construction related activities required outside the permanent corridor including the re-grade of driveways, construction traffic manoeuvring and construction laydown areas.
View all documentation for this project, including from the public hearings, on Auckland Council’s website. (opens in new tab)
Designation Maps
Project status and anticipated construction timeframes
This project is confirmed and operative in the Auckland Unitary Plan. The designation number that can be used to identify this project is: 1499.
There is currently no funding for detailed design or construction of this project. We anticipate the project will be delivered sometime within the next 30 years in line with Auckland Council’s land release strategy.
Information about the designation
Conditions on the designation
There are conditions on the designation which can be viewed in Chapter K of the Unitary Plan.
Contact details
Landowners
If you are a landowner within a designation and would like further information about this project, please contact the Auckland Transport Consent Planning Team.
Consent Planning Team
Developers
If you are a developer and would like further information about this project, please contact the Auckland Transport Strategic Development Programmes Team.