Auckland Transport operates a continuous programme of road maintenance and upgrades via our approved network of contractors. Other events such as filming, parades or car rallies can result in temporary road closures. Road works may also be carried out when services such as water, power, and telecommunications require maintenance or be part of larger infrastructure projects. Find out about AT's projects.

While we endeavour to minimise disruption to your travel plans, temporary detours are sometimes necessary and delays may occur.

Summary of weekly road work activity and traffic restrictions

Current road maintenance and upgrade activity across Auckland listed for information on road works list.

Road maintenance and upgrade activity until 19 January 2020

Location (suburb, street) Type of work Start date Finish date Impact
Ahuroa, West Coast Rd Pre seal repairs 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Albany, Albany Highway (Oakway Drive to Rosedale Road) Pipeline Installation 6/01/2020 10/02/2020 Road closure from 8pm to 6am (Night Shift Only). Contingency dates are 01/02/20 to 07/02/20. Residential access will be maintained, including to Oak manor Drive and Appleby Road. Road will not be closed every night, only for a couple of nights at a time.
Albany, Fernhill Way (Medallion Dr, Fernhill Way intersection to Pannill Pl) Road Improvements 3/02/2020 3/02/2020 Road closure from 7am to 6pm (Day Shift Only). Contingency dates are 04/02/20 to 15/02/20. Resident/Business access will be maintained wherever possible, please speak to marshals at the closure points.
Albany, Rosedale Road (Tawa Drive to Triton Road ) Road Reconstruction 27/01/2020 7/02/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 10/02/20 to 05/03/20.
Albany, Whalf Road (Albany Highway to Cul-de-sac) Road Resurfacing - Chipseal 14/01/2020 14/01/2020 Day - Stop/Go - Try alternate route
Ardmore, Alma Cres (Old Wairoa Road, Papakura to Shirley Road, Papakura) Road Improvements 15/01/2020 16/01/2020 Road closure from 7am to 7pm (Day Shift Only). Contingency date is 17/01/20.
Auckland Central, Albert St (City) (Wyndham St. to Durnham St.) Road Improvements 30/09/2019 17/02/2020 Road closure from 7am on the start date, to 9pm on the finish date.
Auckland Central, Albert St (Wyndham St. to Durnham St.) Road Improvements 30/09/2019 27/01/2020 Road closure from 7am on the start date, to 9pm on the finish date.
Auckland Central, Beaumont St (Madden St to Pakenham st) Pipeline Installation 22/01/2020 5/02/2020 Road closure from 7am to 7pm (Night Shift Only). For access to Jellicoe St please use Daldy St
Auckland Central, Beresford Sq (22 Beresford Square to 6 Beresford Square) Road Reconstruction 6/01/2020 30/04/2023 Road closure from 10am on the start date, to 7pm on the finish date.
Auckland Central, Bradnor Lane (10 Fanshawe Street to 10 Bradnor Lane) Electrical Installation 25/01/2020 27/01/2020 Road closure from 7am on the start date, to 10pm on the finish date.
Auckland Central, Bradnor Lane (10 Fanshawe Street to 10 Bradnor Lane) Electrical Installation 6/02/2020 9/02/2020 Road closure from 7am on the start date, to 10pm on the finish date. Contingency dates are 15/02/20 to 16/02/20.
Auckland Central, Bradnor Lane (10 Fanshawe Street to 10 Bradnor Lane) Electrical Installation 10/04/2020 13/04/2020 Road closure from 7am on the start date, to 10pm on the finish date. Contingency dates are 18/04/20 to 19/04/20.
Auckland Central, Brigham St (Hamer Street to Link Road) Road Improvements 1/07/2019 31/07/2020 Road closure from 7am on the start date, to 7pm on the finish date. Brigham Street will be closed at Hamer Street, no through traffic on Hamer St.
Auckland Central, Brigham St (no. 9 to no. 8) Road Improvements 4/02/2019 31/01/2020 Road closure from midnight on the start date, to midnight on the finish date. Sealink access will be maintained during the closure, no through traffic on Brigham Street.
Auckland Central, Eden Crescent (Shortland St to Emily Pl) Road Improvements 6/01/2020 26/01/2020 Road closure from 9am on the start date, to 10.30pm on the finish date. Contingency dates are 27/01/20 to 16/02/20. Pedestrian access will always be maintained, with provisions for vehicular access for residents and business.
Auckland Central, Federal St (#209 to Wellesley St West) Construction Vehicle Access 13/01/2020 13/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Federal St (#209 to Wellesley St West) Construction Vehicle Access 17/01/2020 18/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Federal St (#209 to Wellesley St West) Construction Vehicle Access 21/01/2020 21/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Federal St (#209 to Wellesley St West) Construction Vehicle Access 25/01/2020 25/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Federal St (#209 to Wellesley St West) Construction Vehicle Access 28/01/2020 28/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Galway St (Britomart Pl to Commerce St) Road Reconstruction 27/12/2019 25/01/2020 Road closure from 7pm on the start date, to 7am on the finish date.
Auckland Central, Gore St (Tyler St to Customs St) Road Reconstruction 27/12/2019 25/01/2020 Road closure from 7pm on the start date, to 7am on the finish date.
Auckland Central, Graham St (Victoria St West to No. 1 Graham St) Road Improvements 3/01/2020 15/01/2020 Road closure from 7am on the start date, to 10pm on the finish date. Access via Hardinge St will be maintained.
Auckland Central, Greys Ave (Pitt Street to Mayoral Drive) Road Improvements 6/01/2020 26/01/2020 Road closure from 9.30am on the start date, to 7.30pm on the finish date.
Auckland Central, Hereford Street (Karangahape Road to East Street) Cycleway Work 29/01/2020 10/03/2020 Road closure from Midnight on the start date, to midnight on the finish date.
Auckland Central, High St (51 to 25) Repairs to Structure 24/02/2020 9/03/2020 Road closure from 7.30pm to 5am (Night Shift Only).
Auckland Central, High St (City) (Shortland St to Victoria St E) Crane Operation 2/02/2020 3/02/2020 Road closure from 9pm to 5am (Night Shift Only). Contingency dates are 09/02/20 to 10/02/20. Resident access will be maintained.
Auckland Central, Liverpool St (Karangahape Rd to City Rd) Crane Operation 25/01/2020 25/01/2020 Road closure from 7am to 4pm (Day Shift Only). Contingency date is 01/02/20. Sunday - 2nd Feb 2020 -Extra Contigency Date.
Auckland Central, Lower Albert St (Custom St West to Quay St) Road Reconstruction 8/12/2019 10/02/2020 Road closure from 7am on the start date, to 5am on the finish date.
Auckland Central, Madden St (Beaumont Street to Daldy Street) Pipeline Installation 29/01/2020 16/03/2020 Road closure from 7am on the start date, to 7pm on the finish date. Access to Parking only on Beaumont St.
Auckland Central, Madden St (Beaumont Street to Daldy Street) Pipeline Installation 28/04/2020 26/06/2020 Road closure from 7am on the start date, to 7pm on the finish date. Madden street and Pakenham Street Closed.
Auckland Central, Pakenham St West (Beaumont Street to Daldy Street) Pipeline Installation 22/01/2020 5/02/2020 Road closure from 7am on the start date, to 7pm on the finish date. Parking removed on Pakenham Street.
Auckland Central, Pakenham St West (Beaumont Street to Daldy Street) Pipeline Installation 28/02/2020 3/04/2020 Road closure from 7am on the start date, to 7pm on the finish date. Parking removed on Pakenham Street.
Auckland Central, Pakenham St West (Beaumont Street to Daldy Street) Pipeline Installation 28/04/2020 26/06/2020 Road closure from 7am on the start date, to 7pm on the finish date. Madden street and Pakenham Street Closed.
Auckland Central, Pakenham St West (Halsey St to Daldy St) Crane Operation 18/01/2020 19/01/2020 Road closure from 7am to 6pm (Day Shift Only).
Auckland Central, Pakenham St West (Halsey St to Daldy St) Crane Operation 25/01/2020 26/01/2020 Road closure from 7am to 6pm (Day Shift Only). Contingency dates are 01/02/20 to 02/02/20. pedestrian access maintained, speak to Traffic controller.
Auckland Central, Princes St (Waterloo Quadrant to Eden Crescent) Road Improvements 6/01/2020 26/01/2020 Road closure from 9am on the start date, to 10.30pm on the finish date. Contingency dates are 27/01/20 to 16/02/20. Pedestrian access will always be maintained, with provisions for vehicular access for residents and businesses.
Auckland Central, Shortland St (Eden Crescent to Bankside St) Road Improvements 6/01/2020 26/01/2020 Road closure from 9am on the start date, to 10.30pm on the finish date. Contingency dates are 27/01/20 to 16/02/20. Pedestrian access will always be maintained, with provisions for vehicular access for residents and businesses.
Auckland Central, Victoria St East (Kitchener St to Queen St) Crane Operation 11/01/2020 11/01/2020 Road closure from 2am to 2pm (Day Shift Only). Contingency date is 18/01/20.
Auckland Central, Victoria St East (Kitchener St to Queen St) Crane Operation 12/01/2020 12/01/2020 Road closure from 4am to 7pm (Day Shift Only). Contingency date is 19/01/20.
Auckland Central, Vogel Lane (Nelson St to #17 Vogel Lane) Private Development 11/03/2019 20/04/2020 Road closure from 6am on the start date, to 6am on the finish date.
Auckland Central, Wellesley St West (109 to 17) Construction Vehicle Access 13/01/2020 13/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Wellesley St West (109 to 17) Construction Vehicle Access 17/01/2020 18/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Wellesley St West (109 to 17) Construction Vehicle Access 21/01/2020 21/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Wellesley St West (109 to 17) Construction Vehicle Access 25/01/2020 25/01/2020 Road closure from 1am to 5am (Day Shift Only).
Auckland Central, Wellesley St West (109 to 17) Construction Vehicle Access 28/01/2020 28/01/2020 Road closure from 1am to 5am (Day Shift Only).
Avondale, Bentinck Street (Drury Street to Great North Rd) Road Resurfacing - Asphalt Reseal 14/01/2020 14/01/2020 Night - Lane Closure - Stop/Go
Avondale, Drury Street (Bentinck St to Cul de sac) Road Resurfacing - Asphalt Reseal 14/01/2020 14/01/2020 Night - Lane Closure - Stop/Go
Avondale, Roberton Road (Great North Rd to Rosebank Rd) Road Resurfacing - Asphalt Reseal 15/01/2020 15/01/2020 Night - Lane Closure - Stop/Go
Bayview, Glen Vista Pl (Glendhu Road to Cul-de-sac) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Stop/Go - Try alternate route
Bayview, Simon Ellice Dr (Bayview Road to Lynn Road) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Stop/Go - Try alternate route
Blockhouse Bay, Great North Road (1 Boundary Road to Dundale Ave) Footpath Maintenance - Footpath 13/01/2020 18/01/2020 Day - Stop/Go - Try alternate route
Browns Bay, Carlisle Rd Dig Outs 13/01/2020 17/01/2020 Stop/Go, contraflow
Clevedon, Coney Lane West (Carlton Crescent to 15 Coney Lane) Telecommunications Installation 13/01/2020 16/01/2020 Road closure from 9am to 4pm (Day Shift Only). Contingency dates are 20/01/20 to 21/01/20.
Clevedon, Geranium Ave (Geranium/Murphys Intersection to end) Road Reconstruction 1/12/2019 5/03/2020 Road closure from 9pm on the start date, to 5am on the finish date. Access to Tyndale Park Christian School and Timmer Rd maintained via Murphys Road from Horsefields Drive and Koropa Road.
Clevedon, Kerrykeel Dr (Kerrykeel/Murphys Intersection to end) Road Reconstruction 1/12/2019 5/03/2020 Road closure from 9pm on the start date, to 5am on the finish date. Access to Tyndale Park Christian School and Timmer Rd maintained via Murphys Road from Horsefields Drive and Koropa Road.
Clevedon, Murphys Road (Ormiston Road to Flat Bush School Road) Road Reconstruction 1/12/2019 5/03/2020 Road closure from 9pm on the start date, to 5am on the finish date. Access to Tyndale Park Christian School and Timmer Rd maintained via Murphys Road from Horsefields Drive and Koropa Road.
Dairy Flat, Austin Rd Sealed road maintenance 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Dairy Flat, Horseshoe Bush Rd Sealed road maintenance 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Devonport, RutherFord Street (Eversleigh Road to Rutherford Street) Road Reconstruction 7/10/2019 28/02/2020 Road closure from Midnight on the start date, to midnight on the finish date. Access will be maintained for 1ABC Rutherford and 45/47 Eversleigh Road.
Devonport, Wynyard Street (Clarence St to Queens Pde) Road Maintenance 8/01/2020 9/01/2020 Road closure from 8.30pm to 6am (Night Shift Only). Contingency dates are 09/01/20 to 22/01/20. Please speak with Traffic Controllers if you need access to a property within this section of road.
Drury, Averill St (Great South Road to Railway Street) Road Improvements 8/01/2020 9/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 09/01/20 to 10/01/20. Resident access will be maintained, please speak to marshals at the closure points.
Drury, Park Estate Road (#221 to Culdesac) Road Reconstruction 6/01/2020 6/02/2020 Road closure from 7am on the start date, to 7pm on the finish date.
Eden Tce, Khyber Pass Rd (Symonds St to Grafton Rd) Road Resurfacing - Asphalt Reseal 12/01/2020 12/01/2020 Night - One Direction Detour
Eden Tce, Khyber Pass Rd (Symonds St to Grafton Rd) Road Resurfacing - Asphalt Reseal 19/01/2020 19/01/2020 Night - One Direction Detour
Eden Tce, Symonds St (Alex Evans to Mt Eden Rd) Road Resurfacing - Asphalt Reseal 8/01/2020 21/01/2020 Night - One Direction Detour
Eden Terrace, Flower St (13 Flower St to 18 Flower St) Pipeline Installation 21/12/2019 1/03/2020 Road closure from 10am on the start date, to 7pm on the finish date.
Ellerslie, Cawley St (Main Highway to End) Road Resurfacing - Asphalt Reseal 15/01/2020 15/01/2020 Day - Lane Closure - Stop/Go
Epsom, Arcadia Rd (Manukau Rd to The Drive) Road Resurfacing - Chipseal 15/01/2020 15/01/2020 Day - Lane Closure - Stop/Go
Epsom, Atherton Rd (The Drive to Cul de-sec) Road Maintenance - Kerb/Channel Footpath Renewals 7/01/2020 29/02/2020 Day - One Direction Detour - Stop/Go Control
Epsom, Bloomfield Pl (Merivale Ave to Cul De-sec) Road Resurfacing - Chipseal 11/01/2020 11/01/2020 Day - Lane Closure - Stop/Go
Epsom, Cecil Rd (Owens Rd to Epsom Ave) Road Resurfacing - Chipseal 15/01/2020 15/01/2020 Day - Lane Closure - Stop/Go
Epsom, Marama Ave (Owens Rd to Epsom Ave) Road Resurfacing - Chipseal 14/01/2020 14/01/2020 Day - Lane Closure - Stop/Go
Epsom, Merivale Ave (The Drive to Rd End RHS Islands) Road Resurfacing - Chipseal 11/01/2020 11/01/2020 Day - Lane Closure - Stop/Go
Epsom, Movern Rd (Balmoral Rd to Watling St) Road Resurfacing - Chipseal 17/01/2020 17/01/2020 Day - Lane Closure - Stop/Go
Epsom, Queen Mary Ave (Manukau Rd to The Drive) Road Resurfacing - Chipseal 14/01/2020 14/01/2020 Day - Lane Closure - Stop/Go
Epsom, Ranfurly Road (Manukau Road to No. 34) Water Supply Improvement 7/10/2019 28/08/2020 Road closure from 7am on the start date, to 7pm on the finish date.
Epsom, Wilding Ave (The Drive to Cul de-sec) Road Resurfacing - Chipseal 18/01/2020 18/01/2020 Day - Lane Closure - Stop/Go
Glen Eden, Ryden Pl (Millan Dr to Culdesac) Road Maintenance - Mill and Fill 15/01/2020 15/01/2020 Day - Stop/Go - Try alternate route
Glenfield, Camrose Pl (Glenfield Road to Cul-de-sac) Road Resurfacing - Chipseal 17/01/2020 17/01/2020 Day - Stop/Go - Try alternate route
Glenfield, Glendhu Rd (Glen Vista Pl to Glenfield Rd) Road Improvements 20/01/2020 24/01/2020 Road closure from 7pm to 5am (Night Shift Only). Contingency dates are 26/01/20 to 30/01/20. Resident/Business access will be maintained wherever possible, please speak to marshals at the closure points.
Glenfield, High Road (Glenfield Road to Marlborough Ave) Road Reconstruction - Footpath, Kerb & Channel 15/01/2020 28/02/2020 Day - One Direction Detour
Glenfield, Peach Rd (Glenfield Road to Stanley Road) Road Resurfacing - Chipseal 17/01/2020 17/01/2020 Day - Stop/Go - Try alternate route
Glenfield, Sunnynook Road (166 Sunnynook Road to Totara Vale Drive) Road Maintenance 19/01/2020 23/01/2020 Road closure from 10pm to 6am (Night Shift Only). Contingency dates are 27/01/20 to 30/01/20. Sunnynook overbridge will be closed to facilitate bridge maintenance works.
Glenfield, Sunset Road (Glenfield Road to Girrahween Drive) Road Improvements 20/01/2020 24/01/2020 Road closure from 7pm to 5am (Night Shift Only). Contingency dates are 26/01/20 to 30/01/20. Resident/Business access will be maintained wherever possible, please speak to marshals at the closure points.
Glorit, Kaipara Hills Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Grafton, Burleigh St (Khyber Pass Rd to No. 6) Water Supply Improvement 3/12/2019 28/02/2020 Road closure from 5am on the start date, to 5am on the finish date.
Greenhithe, Admirals Court Drive (Pitoitoi Avenue to Moko Lane) Crane Operation 3/02/2020 3/02/2020 Road closure from 7am to 6pm (Day Shift Only). Contingency dates are 04/02/20 to 08/02/20. Resident access will be maintained
Greenhithe, Isobel Road (8 Isobel Road to 39 Isobel Road) Pipeline Installation 6/01/2020 31/01/2020 Road closure from 7am to 7pm (Day Shift Only). Contingency dates are 01/02/20 to 07/02/20. Residential access will be maintained at all times
Greenhithe, Rahui Road (16 to 17) Water Supply Improvement 2/09/2019 13/06/2020 Road closure from Midnight on the start date, to Midnight on the finish date. Contingency dates are 12/09/19 to 23/06/20.
Haranui, Haranui Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Haranui, Tarawera Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Hauraki, Crimson Park (Fernhill Way to Cul-de-sac) Road Resurfacing - Chipseal 13/01/2020 13/01/2020 Day - Stop/Go - Try alternate route
Henderson, Awaroa Rd (Sunhill Rd to Millbrook Rd (Henderson)) Road Resurfacing - Chipseal 14/01/2020 14/01/2020 Day - Lane Closure - Stop/Go
Henderson, Gregg Place (Awaroa Rd to cul de sac (Te Atatu)) Road Resurfacing - Chipseal 15/01/2020 15/01/2020 Day - Lane Closure - Stop/Go
Henderson, Henderson Valley Rd (Candia Rd to Gum Rd) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Lane Closure - Stop/Go
Henderson, Landow Pl (Parrs Cross Rd to Cul De Sac) Road Resurfacing - Chipseal 15/01/2020 15/01/2020 Day - Lane Closure - Stop/Go
Henderson, Parrs Cross Rd (Pine Ave to Henderson Valley Rd) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Lane Closure - Stop/Go
Henderson, San Domingo Rise (San Bernadino Drive to San Diego Crt RAB) Road Improvements 6/01/2020 7/01/2020 Road closure from 8.30am to 6pm (Day Shift Only). Contingency dates are 08/01/20 to 31/01/20. Residents please speak with traffic controllers, job will roll over to the next available day.
Henderson, San Pedro Pl (San Bernadino Drive to San Vito Pl RAB) Road Improvements 6/01/2020 7/01/2020 Road closure from 8.30am to 6pm (Day Shift Only). Contingency dates are 08/01/20 to 31/01/20. Residents please speak with traffic controllers, job will roll over to the next available day.
Henderson, Takahe Rd (Pine Ave (At Tee)) Road Resurfacing - Chipseal 14/01/2020 14/01/2020 Day - Lane Closure - Stop/Go
Henderson, Universal Drive (Swanson Road to Bittern Pl) Road Reconstruction - Stabilisation 10/01/2020 21/01/2020 Continuous - One Direction Detour
Henderson, Wattle Rd (View Rd to Awaroa Rd (Sunnyvale)) Road Resurfacing - Chipseal 15/01/2020 15/01/2020 Day - Lane Closure - Stop/Go
Henderson, James Laurie St (Great North Rd (RHS) to Waitaki St) Road Resurfacing - Asphalt Reseal 16/01/2020 16/01/2020 Night - Lane Closure - Stop/Go
Henderson, Mountain Road (After Fairy Falls) Road Maintenance - Digout 6/01/2020 11/01/2020 Day - Road Closure
Henderson Valley, Mountain Road (Turangi Road to 68 Mountain Road) Road Maintenance 13/01/2020 24/01/2020 Road closure from 9am to 5pm (Day Shift Only). Contingency dates are 27/01/20 to 31/01/20. Resident access only, pointsman onsite to assist.
Hillsborough, Oakdale Rd (Locke Ave to Melrose Rd) Road Maintenance - Kerb/Channel Footpath Renewals 7/01/2020 13/02/2020 Day - One Direction Detour - Stop/Go Control
Hobsonville Point, Joshua Carder Dr (Thomas Riley Ave to the end of Joshua Carder Dr) Private Development 6/01/2020 29/02/2020 Road closure from 7am on the start date, to 7pm on the finish date.
Howick, Fencible Dr (Wellington Street to Cook Street) Road Improvements 5/01/2020 10/01/2020 Road closure from 7pm to 6am (Night Shift Only). Contingency dates are 20/01/20 to 24/01/20. Additional contingency dates are 28/01/20 to 31/01/20. Central Terrace access will be closed. Parking will still be available and access permitted through Fencible Drive while road closure in place.
Howick, Fencible Dr (Wellington Street to Cook Street) Road Improvements 12/01/2020 13/01/2020 Road closure from 7am to 6am (Night Shift Only). Contingency dates are 19/01/20 to 20/01/20. Additional contingency dates are 27/01/20 to 28/01/20. Central Terrace access will be closed. Parking will still be available and access permitted through Fencible Drive while road closure in place.
Howick, Fencible Dr (Wellington Street to Cook Street) Road Improvements 13/01/2020 17/01/2020 Road closure from 7pm to 6am (Night Shift Only). Contingency dates are 20/01/20 to 24/01/20. Additional contingency dates are 28/01/20 to 31/01/20. Central Terrace access will be closed. Parking will still be available and access permitted through Fencible Drive while road closure in place. 
Howick, Moore St (Picton Street to Abercrombie Street) Road Improvements 5/01/2020 10/01/2020 Road closure from 7pm to 6am (Night Shift Only). Contingency dates are 20/01/20 to 24/01/20. Additional contingency dates are 28/01/20 to 31/01/20. Central Terrace access will be closed. Parking will still be available and access permitted through Fencible Drive while road closure in place. 
Howick, Moore St (Picton Street to Abercrombie Street) Road Improvements 12/01/2020 13/01/2020 Road closure from 7am to 6am (Night Shift Only). Contingency dates are 19/01/20 to 20/01/20. Additional contingency dates are 27/01/20 to 28/01/20. Central Terrace access will be closed. Parking will still be available and access permitted through Fencible Drive while road closure in place. 
Howick, Moore St (Picton Street to Abercrombie Street) Road Improvements 13/01/2020 17/01/2020 Road closure from 7pm to 6am (Night Shift Only). Contingency dates are 20/01/20 to 24/01/20. Additional contingency dates are 28/01/20 to 31/01/20. Central Terrace access will be closed. Parking will still be available and access permitted through Fencible Drive while road closure in place.
Huia, Laingholm Drive (Janet Place to Warner Park Ave) Road Maintenance - Mill and Fill 13/01/2020 13/01/2020 Day - Stop/Go - Try alternate route
Kaukapakapa, Kanohi Rd Sealed road maintenance 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Kumeu, Old North Rd Pre seal repairs 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Kumeu, Waitakere Road/Hanham Road Intersection A/C Sealing 19/01/2020 19/01/2020 Full Road Closure
Long Bay, Ashley Ave Minor Works 16/01/2020 16/01/2020 Shoulder closure, Minor impact
Mahurangi East, Ridge Rd Sealed road maintenance 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Mangere, Ihumatao Quarry Road (closed at the intersection with Oruarangi Rd to end) Road Reconstruction 6/05/2019 3/07/2020 Road closure from 7am on the start date, to 6.30pm on the finish date.
Mangere, McIntyre Road - Swanson Road Asphalt Surfacing 14/01/2020 14/01/2020 Lane Closure. One Way Detour. Delays Possible.
Mangere, McIntyre Road - Woodward Ave Asphalt Surfacing 11/01/2020 13/01/2020 Lane Closure. One Way Detour. Delays Possible.
Mangere, Swanson Road Asphalt Surfacing 15/01/2020 16/01/2020 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Manurewa, Wordsworth Road (Rowandale to Arnwood Rd) Road Improvements 6/01/2020 26/01/2020 Road closure from 7am on the start date, to 7am on the finish date. Resident access will be maintained wherever possible, please speak to marshals at the closure points.
Manurewa, Wordsworth Road (Rowandale to Arnwood Rd) Road Improvements 27/01/2020 16/02/2020 Road closure from 7am on the start date, to 7am on the finish date. Resident access will be maintained wherever possible, please speak to marshals at the closure points.
Manurewa, Wordsworth Road (Rowandale to Bedlington Ave) Road Improvements 6/01/2020 26/01/2020 Road closure from 7am on the start date, to 7am on the finish date. Contingency dates are 27/01/20 to 06/02/20. Resident/Business access will be maintained wherever possible, please speak to marshals at the closure points.
Manurewa, Wordsworth Road (Rowandale to Bedlington Ave) Road Improvements 6/01/2020 26/01/2020 Road closure from 7am on the start date, to 7am on the finish date. Resident access will be maintained wherever possible, please speak to marshals at the closure points.
Manurewa, Wordsworth Road (Rowandale to Bedlington Ave) Road Improvements 27/01/2020 16/02/2020 Road closure from 7am on the start date, to 7am on the finish date. Resident access will be maintained wherever possible, please speak to marshals at the closure points.
Massey, Alidade Pl (Aldern Road to Culdesac) Road Resurfacing - Asphalt Reseal 14/01/2020 14/01/2020 Day - Stop/Go - Try alternate route
Massey, Waimumu Road (Lincoln Park Ave to Triangle Road RAB) Road Maintenance 26/01/2020 27/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 27/01/20 to 13/02/20.
Matakana, Green Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Meadowbank, Meadowbank Rd (#185 to Bonnie Brae Rd) Construction - Footpath Renewal 10/01/2020 8/02/2020 Day - One Direction Detour
Milford, Alma Road Minor Works 14/01/2020 14/01/2020 Shoulder closure, Minor impact
Mission Bay, Patteson Ave (Dudley Rd to Godden Cres) Construction - Kerb & Channel 6/01/2020 25/01/2020 Day - One Direction Detour
Mt Eden, Dexter Ave (Mewburn Ave to Westminister Rd) Road Maintenance - Kerb/Channel Footpath Renewals 7/01/2020 17/03/2020 Day - One Direction Detour - Stop/Go Control
Mt Roskill, Alberton Ave (Alexis Ave to Mt Albert Rd) Road Maintenance - Kerb/Channel Footpath Renewals 7/01/2020 22/01/2020 Day - One Direction Detour
Mt Roskill, Balfron Ave (Freeland Avenue to the end of Balfron Avenue) Road Reconstruction 31/01/2020 4/03/2020 Road closure from 7am on the start date, to 7pm on the finish date.
Mt Roskill, Freeland Ave (Vercoe Street to #52 Freeland Avenue) Road Improvements 13/01/2020 27/02/2020 Road closure from 7am on the start date, to 7pm on the finish date.
Mt Roskill, Sanft Ave (2 to 52) Private Devlopement 1/07/2019 29/02/2020 Road closure from 7am on the start date, to 6pm on the finish date.
Muriwai, Motutara Road (Muriwai Road to Oaia Road) Road Improvements 12/02/2020 17/02/2020 Road closure from 7pm to 5am (Night Shift Only). Contingency dates are 17/02/20 to 20/02/20. Resident/Business access will be maintained wherever possible, please speak to marshals at the closure points.
Muriwai, Muriwai Road/Hamilton Road Intersection A/C Sealing 14/01/2020 15/01/2020 Stop/Go as necessary/Shoulder closures where needed.
New Lynn, Golf Road (Titirangi Rd to Portage Road) Watermain replacement 15/04/2019 15/03/2020 Lane closure (1 way detour) - delays likely. Sections may be open during this time.
New Lynn, Portage Road (Golf Rd RAB to Kinross Street) Water Supply Improvement 6/01/2020 31/01/2020 Road closure from 7am on the start date, to 7pm on the finish date.
New Lynn, Westall Road (Northall Road to Cul de sac) Road Maintenance - Mill and Fill 16/01/2020 16/01/2020 Day - Stop/Go - Try alternate route
Northcote, Cadness Street (#46 Cadness Street to #92 Cadness Street) Road Reconstruction 4/11/2019 4/05/2020 Road closure from 7am on the start date, to 7pm on the finish date.
Northcote, Tonar Street (#58 Tonar Street to #62a Tonar Street) Stormwater Improvement 6/01/2020 31/01/2020 Road closure from 7am on the start date, to 7pm on the finish date.
Omaha, Omaha Valley Rd Tree Trimming 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Onehunga, Church St (Neilson St to Goodman Pl) Construction - Kerb & Channel 30/12/2019 25/01/2020 Day - Lane Closure - Capacity reduced
Onehunga, Church St (Spring St to Alfred St) Intersection Improvements 26/12/2019 13/01/2020 Road closure from 6am on the start date, to 6pm on the finish date. Access will remain to residents of Victoria Street and Church Street.
Onehunga, Victoria St (Arthur Street to Princes Street) Intersection Improvements 26/12/2019 13/01/2020 Road closure from 6am on the start date, to 6pm on the finish date. Access will remain to residents of Victoria Street and Church Street.
Onehunga, Victoria St (Church St/Victoria St Intersection) Road Reconstruction - Pavement Works 26/12/2019 19/01/2020 Day - Road Closure
Orakei, Ngapipi Rd (#46 to Kepa Rd) Road Maintenance - Guard Rail Repair 16/01/2020 16/01/2020 Night - Lane Closure - Stop/Go
Orakei, Rautara St (#49 to #1) Stormwater Improvement 13/01/2020 18/01/2020 Road closure from 7am to 7pm (Day Shift Only). Contingency dates are 20/01/20 to 25/01/20.
Orakei, Tautari St (11 Paora St. corner Tautari St. to 3 Tautari St.) Crane Operation 20/02/2020 22/02/2020 Road closure from 7am to 6pm (Day Shift Only). Contingency date is 23/02/20. Road closed due to crane dismantling. Detour route provided.
Otahuhu, High Street Pre-seal 8/01/2020 24/01/2020 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Otara, Hamill Road Maintenance 16/01/2020 31/01/2020 Lane Closure. One Way Detour. Delays Possible.
Otara, Highbrook Dr (Hellabys Road to El Kobar Drive) Road Maintenance 3/01/2020 3/01/2020 Road closure from 8am to 7pm (Day Shift Only). Contingency dates are 04/01/20 to 10/01/20. Highbrook Drive will be reduced to one lane in each direction for 48 hours to help embed the new chip into the surface. There will also be no entry into Highbrook Drive from SH01 Southbound Off-ramp throughout this period. Speed will be reduced to 30km/h, please drive with caution.
Oteha, Maidstone Place (Spencer Road to Cul-de-sac) Road Resurfacing - Chipseal 13/01/2020 13/01/2020 Day - Stop/Go - Try alternate route
Oteha, Spencer Road (East Coast Road to Mcclymonts Road) Road Resurfacing - Chipseal 13/01/2020 13/01/2020 Day - Stop/Go - Try alternate route
Pakuranga, Williams Ave (Pakuranga Road to Tamaki Bay Drive) Road Improvements 20/01/2020 16/02/2020 Road closure from 7am on the start date, to 7pm on the finish date. Contingency dates are 16/02/20 to 01/03/20. Detours in place to direct residents and visitors to the temporary access and exit points.
Panmure, Pilkington Rd (#71 to #79) Road Maintenance - Footpath Repair 15/01/2020 15/01/2020 Day - Lane Closure - Capacity reduced
Papatoetoe, Caspar Road (Great South Road (Manukau) to Brooklyn Avenue) Road Improvements 3/02/2020 4/02/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 05/02/20 to 07/02/20.
Papatoetoe, Oakland Road-Hayfield Way Pre-seal 9/01/2020 22/01/2020 Stop/Go controls as necessary. Delays Possible.
Papatoetoe, Sumner St (#2 to Hillside Road) Road Improvements 15/01/2020 17/01/2020 Road closure from 7am to 7pm (Day Shift Only). Contingency date is 18/01/20. Resident access will be maintained, please speak to marshals at the closure points.
Parkhurst, Evans Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Penrose, Station Rd (Fairfax Ave to Walls Rd) Construction - Footpath Renewal 27/12/2019 25/01/2020 Day - Lane Closure - Capacity reduced
Ponsonby, Brown St (Fitzroy St to Richmond Rd) Crane Operation 31/01/2020 31/01/2020 Road closure from 9am to 3pm (Day Shift Only). Contingency dates are 03/02/20 to 04/02/20. Resident access will be maintained
Ponsonby, Dedwood Tce (Caroline St to Jervois Rd) Pipeline Installation 13/01/2020 17/01/2020 Road closure from 7am to 5pm (Day Shift Only).
Ponsonby/Grey L, Ariki St (Crummer Rd to Williamson Ave) Road Resurfacing - Chipseal 13/01/2020 13/01/2020 Day - Lane Closure - Stop/Go
Ponsonby/Grey L, Baildon Rd (Dryden St to Schofield St) Road Resurfacing - Chipseal 13/01/2020 13/01/2020 Day - Lane Closure - Stop/Go
Ponsonby/Grey L, Vermont St (Ponsonby Rd to John St) Road Resurfacing - Chipseal 13/01/2020 13/01/2020 Day - Lane Closure - Stop/Go
Puke/Pat/Awhitu/Wai, Waiuku Road (Wily Road to House No. 499) Road Maintenance 8/01/2020 9/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 10/01/20 to 15/01/20.
Pukekohe , Cape Hill Road (Valley Road to Northvale Place) Road Maintenance 9/01/2020 10/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 10/01/20 to 16/01/20.
Pukekohe, Customs St (Manukau Road to End of the street) Road Maintenance 21/01/2020 22/01/2020 Road closure from 9pm to 5am (Night Shift Only). Contingency dates are 23/01/20 to 28/01/20.
Pukekohe, Edinburgh St (Devon Lane to Shop No. 56) Road Maintenance 19/01/2020 20/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 20/01/20 to 27/01/20.
Pukekohe, Harris St (House No. 61 to Edinburgh St) Road Maintenance 21/01/2020 22/01/2020 Road closure from 9.30pm to 5am (Night Shift Only). Contingency dates are 23/01/20 to 28/01/20.
Pukekohe, King St (Shop No. 62 to Shop No. 104) Road Maintenance 19/01/2020 20/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 20/01/20 to 27/01/20.
Pukekohe, Massey Ave (Edinburgh St to Roulston St) Road Maintenance 20/01/2020 21/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 22/01/20 to 27/01/20.
Pukekohe, Queen St (Pukekohe) (House No. 71 to House No. 99) Road Maintenance 21/01/2020 22/01/2020 Road closure from 9.30pm to 5am (Night Shift Only). Contingency dates are 23/01/20 to 28/01/20.
Pukekohe, Stuart Road (Waiuku Road to House No. 44) Road Maintenance 22/01/2020 23/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 24/01/20 to 29/01/20.
Pukekohe, Subway Road (Pukekohe) (Station Road to House No. 39) Road Maintenance 24/01/2020 25/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 26/01/20 to 31/01/20.
Pukekohe, Sweetcorn Pl (Adams Drive to End of the street) Road Maintenance 7/01/2020 8/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 09/01/20 to 16/01/20.
Red Hill, Pembrook St (Sutton Crescent to Valentine Street) Road Improvements 14/01/2020 17/01/2020 Road closure from 7am to 7pm (Day Shift Only). Contingency date is 18/01/20.
Remuera, Ohinerau St (Clonbern Rd to #30) Road Maintenance - Digout 13/01/2020 14/01/2020 Day - One Direction Detour - Stop/Go Control
South Head, Donohue Rd, Trig Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
South Head, Fuller Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
South Head, Higham Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
South Head, McMurdo Rd, Webber Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
South Head, Shine Rd, Mairetahi Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
South Head, Slater Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
South Head, Te Kanae Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
South Head, Wilson Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
St Marys Bay, Hackett St (22 Hackett Street to 14 Hackett Street) Stormwater Improvement 12/01/2020 31/05/2020 Road closure from 7am on the start date, to 7pm on the finish date.
St. Heliers, Long Drive (#92 to #132) Road Maintenance - Guard Rail Repair 14/01/2020 14/01/2020 Day - Lane Closure - Capacity reduced
St. Heliers, Maskell St (St Heliers Bay Rd to Berwick St) Road Resurfacing - Asphalt Reseal 16/01/2020 17/01/2020 Day - Lane Closure - Capacity reduced
St. Johns, Caulton St (Simkin Ave to Howard Hunter Ave) Road Maintenance - Mill & Fill 17/01/2020 17/01/2020 Day - Lane Closure - Capacity reduced
St. Johns, Cotton St (Strong St to End) Road Maintenance - Mill & Fill 16/01/2020 16/01/2020 Day - Lane Closure - Capacity reduced
St. Johns, Howard Hunter Ave (Felton Mathew Ave to Swainston Rd) Road Maintenance - Mill & Fill 17/01/2020 17/01/2020 Day - Lane Closure - Capacity reduced
St. Johns, Simkin Ave (Strong St to Felton Mathew Ave) Road Maintenance - Mill & Fill 16/01/2020 16/01/2020 Day - Lane Closure - Capacity reduced
St. Johns, Strong St (College Rd to Howard Hunter Ave) Road Maintenance - Mill & Fill 17/01/2020 17/01/2020 Day - Lane Closure - Capacity reduced
Stanley Point, Huia Street (Calliope Rd to Queens Parade) Electrical Installation 21/01/2020 21/01/2020 Road closure from 8am to 4pm (Day Shift Only). Contingency dates are 22/01/20 to 23/01/20.
Swanson, Waitakere Road (closed at the intersection with Hanham Rd to end) Road Improvements 19/01/2020 20/01/2020 Road closure from 7pm to 5am (Night Shift Only). Contingency dates are 20/01/20 to 24/01/20. Resident/Business access will be maintained wherever possible, please speak to marshals at the closure points.
Takapuna, Old Lake Rd Mill/Fill 14/01/2020 15/01/2020 Stop/Go, minor impact
Tapora, Burma Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Tapora, Fitzgerald Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Tauhoa, Poynter Rd, J Mason Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Taupaki, Hanham Rd Pre seal repairs 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Taupaki, Waitakere Rd Pre seal repairs 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Te Atatu, Enderby Drive (Te Atatu Road to 14 Enderby Drive) Footpath Maintenance - Footpath 13/01/2020 17/01/2020 Day - One Direction Detour
Te Atatu, Finlow Rd (Mcleod Rd to Divich Ave) Road Resurfacing - Chipseal 17/01/2020 17/01/2020 Day - Lane Closure - Stop/Go
Te Atatu, Highlight Parade (Jaemont Avenue to Cul De Sac) Road Resurfacing - Chipseal 17/01/2020 17/01/2020 Day - Lane Closure - Stop/Go
Te Atatu, Jaemont Ave (Te Atatu Road to Te atutu Rd) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Lane Closure - Stop/Go
Te Atatu, Sunrise Lane (Jaemont Avenue to Cul De Sac) Road Resurfacing - Chipseal 17/01/2020 17/01/2020 Day - Lane Closure - Stop/Go
Three Kings, Bremner Ave (Milliken Ave to Mt Albert Rd) Pipeline Installation 27/12/2019 28/01/2020 Road closure from 7am on the start date, to 5am on the finish date. Mt Albert Road will be open to westbound traffic from the 6th January; Scout Ave and Bremner Ave remain closed until the 28th January.
Three Kings, Churches Ave (Dally Tce to Cul de-sec) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Lane Closure - Stop/Go
Three Kings, Dally Tce (Duke St to Cul de-sec) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Lane Closure - Stop/Go
Three Kings, Fulljames Ave (Duke St to Cul de-sec) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Lane Closure - Stop/Go
Three Kings, Hamon Ave (Fulljames Ave to Cul de-sec) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Lane Closure - Stop/Go
Three Kings, Henshaw Ave (Smallfield Ave to Countdown carpark) Road Maintenance - Kerb/Channel Footpath Renewals 20/01/2020 25/01/2020 Day - Road Closure
Three Kings, McCullough Ave (Mt Albert Rd to Scout Ave) Road Maintenance - Kerb/Channel Footpath Renewals 13/01/2020 20/01/2020 Day - One Direction Detour - Stop/Go Control
Three Kings, Mt Albert Road (Three Kings) (Parau Street to Frost Road) Pipeline Installation 27/12/2019 28/01/2020 Road closure from 7am on the start date, to 5am on the finish date. Mt Albert Road will be open to westbound traffic from the 6th January; Scout Ave and Bremner Ave remain closed until the 28th January.
Three Kings, Noton Rd (Oakdale Rd to Cul de-sac) Road Resurfacing - Chipseal 18/01/2020 18/01/2020 Day - Lane Closure - Stop/Go
Three Kings, Scout Ave (No.3 to Mt Albert Rd) Pipeline Installation 27/12/2019 28/01/2020 Road closure from 7am on the start date, to 5am on the finish date. Mt Albert Road will be open to westbound traffic from the 6th January; Scout Ave and Bremner Ave remain closed until the 28th January.
Three Kings, Simmonds Ave (Scout Ave to Cul de-sec) Road Resurfacing - Chipseal 17/01/2020 17/01/2020 Day - Lane Closure - Stop/Go
Torbay, Glencoe Rd Asphalt surfacing 14/01/2020 15/01/2020 Stop/Go,
Totara Vale, Tableau Pl (Athena Drive to Cul-de-sac) Road Resurfacing - Chipseal 15/01/2020 15/01/2020 Day - Stop/Go - Try alternate route
Totara Vale, Tacitus Pl (Athena Drive to Cul-de-sac) Road Resurfacing - Chipseal 15/01/2020 15/01/2020 Day - Stop/Go - Try alternate route
Unsworth Heights, Azure Gr (Goldfinch Rise to Cul-de-sac) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Stop/Go - Try alternate route
Unsworth Heights, Exeter Pl (Devonshire Road to Cul-de-sac) Road Resurfacing - Chipseal 14/01/2020 14/01/2020 Day - Stop/Go - Try alternate route
Unsworth Heights, Jacanas Pl (Goldfinch Rise to Cul-de-sac) Road Resurfacing - Chipseal 16/01/2020 16/01/2020 Day - Stop/Go - Try alternate route
Unsworth Heights, Sabana Pl (Santiago Crescent to Cul-de-sac) Road Resurfacing - Chipseal 14/01/2020 14/01/2020 Day - Stop/Go - Try alternate route
Unsworth Heights, Santiago Creas (Meadowood Drive to Meadowood Drive) Road Resurfacing - Chipseal 14/01/2020 14/01/2020 Day - Stop/Go - Try alternate route
Waimauku, Ararimu Valley Rd Sealed road maintenance 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Waimauku, Denehurst Drive cul de sac A/C Sealing 16/01/2020 16/01/2020 Stop/Go as necessary/Shoulder closures where needed.
Waioneke, McLeod Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Waioneke, Monk Rd Unsealed Maintenance 13/01/2020 24/01/2020 Mobile Operation
Waiuku, Bella Villa Dr (Stonehurst Ave to #12) Road Maintenance 7/01/2020 7/01/2020 Road closure from 7am to 7pm (Day Shift Only). Contingency dates are 08/01/20 to 14/01/20.
Warkworth, Morpeth Street A/C Sealing 13/01/2020 14/01/2020 Full Road Closure
Warkworth, Morpeth Street (Neville St to Alnwick St) Road Improvements 13/01/2020 14/01/2020 Road closure from 8pm to 5am (Night Shift Only). Contingency dates are 14/01/20 to 21/01/20. Resident/Business access will be maintained wherever possible, please speak to marshals at the closure points.
Warkworth, Mason Height Pre seal repairs 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Warkworth, Sandspit Rd Pre seal repairs 13/01/2020 24/01/2020 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Whenuapai, Airport Road (Brigham Creek Road to Brigham Creek Road) Road Improvements 9/02/2020 11/02/2020 Road closure from 7pm to 5am (Night Shift Only). Contingency dates are 12/02/20 to 18/02/20. Resident/Business access will be maintained wherever possible, please speak to marshals at the closure points.
Whenuapai, Brigham Creek Road (Totara Road to Airport Road) Road Reconstruction - Concrete Works 7/01/2020 13/03/2020 Day - Lane Closure - Capacity reduced