Auckland Transport operates a continuous programme of road maintenance and upgrades via our approved network of contractors. Other events such as filming, parades or car rallies can result in temporary road closures. Road works may also be carried out when services such as water, power, and telecommunications require maintenance.

While we endeavour to minimise disruption to your travel plans, temporary detours are sometimes necessary and delays may occur.

Roadworks Map 220

Road works map

View roadworks on a map

Pasifika220

Events causing delays

Road closures or restrictions as the result of an event in Auckland.

Eden Park Stadium

Eden Park road closures

Road closures and parking restrictions will be in place on event days at Eden Park.


Summary of weekly road work activity and traffic restrictions

Current road maintenance and upgrade activity across Auckland listed for information on road works list.

Road maintenance and upgrade activity for week ending 5 March 2017

Location (suburb, street) Type of work Start date Finish date Impact
Albany, Bush Road Road Reconstruction - Reseal 1/03/2017 2/03/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Albany, Albany Expressway Road Reconstruction - Crack Sealing 28/02/2017 2/03/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Albany, Corithian Drive Road Reconstruction - Footpath and K&C 27/02/2017 28/02/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Albany, Munroe Lane Private Development 31/10/2016 30/04/2017 Road Closed 24 Hours per day
Albany, Spencer Road (Arirang Rise to 44 Spencer Road) Pipeline Installation 1/02/2017 21/02/2017 Road closure from midnight on the start date, to midnight on the finish date. Resident access maintained at all times. Car parking restrictions will apply.
Albany Heights, Kewa Road Private Development 11/11/2016 30/03/2017 Portable traffic signals
Auckland Central, Albert St (from Swanson St to Wyndham St City Rail Link Construction - Piling 1/01/2017 1/03/2017 Lane Closure. Stop/Go controls as necessary. Delays possible
Auckland Central, Albert St/Wyndham St Intersection (Albert St to Federal St) City Rail Link Construction - Piling 1/01/2017 26/02/2017 Road closed 24 hours per day
Auckland Central, Albert St/Wyndham St Intersection (Albert St to Queen St) City Rail Link Construction - Piling 26/02/2017 15/03/2017 Road closed 24 hours per day
Auckland Central, Albert St/Wyndham St Investigation City Rail Link Construction - Road Constrcution 1/01/2017 1/03/2017 One direction detour. Stop/Go controls as necessary. Delays possible.
Auckland Central, Chancery St (Bacons Lane to Courthouse Lane) Road Reconstruction 5/01/2017 1/06/2017 Road closure from midnight on the start date, to midnight on the finish date.
Auckland Central, Customs St West City Rail Link preliminary works - Road Constrcution 1/01/2017 1/07/2017 Lane Closure. Stop/Go controls as necessary. Delays possible
Auckland Central, Freyberg Square (between High St, Courthouse Ln and Freyberg Pl) Footpath Work 22/08/2016 30/06/2017 Road works - expect delays
Auckland Central, Galway Street (Queen St to Commerce St) Pavement Surface Colouring 19/02/2017 23/02/2017 Road closure from 7pm to 6am (Each Night). Contingency dates will be 26/2/17 - 2/3/17
Auckland Central, Gore St (Quay Street to Tyler Street) Telecommunications installation 13/03/2017 14/03/2017 Road closure from 8pm on the start date, to 5am on the finish date. Contingency dates: Night of 14/03/17
Auckland Central, Halsey St (Gaunt St to Pakenham St West) Road Reconstruction 16/05/2016 31/03/2017 Road closure from midnight on the start date, to midnight on the finish date.
Auckland Central, Khyber Pass Road (371) Building Maintenance 10/01/2017 9/07/2017 Road works - expect delays
Auckland Central, Lorne St (South) (Rutland St to Wellesley St East) Construction vehicle access 25/08/2016 31/07/2018 Road closure from 9am on the start date, to 5pm on the finish date.
Auckland Central, Lower Albert St (Customs Street West to Quay Street) Telecommunications installation 21/03/2017 22/03/2017 Road closure from midnight on the start date, to 5am on the finish date. Contingency dates: Nights of 22nd, 23rd, 27th & 28th March 2017
Auckland Central, Marmion St (Queen Street to White Street) Construction vehicle access 25/07/2016 21/02/2017 Road closure from 7am on the start date, to 5pm on the finish date.
Auckland Central, Mills Lane City Rail Link Construction - Piling 23/02/2017 15/03/2017 One direction detour. Stop/Go controls as necessary. Delays possible.
Auckland Central, O'Connell St (Courthouse Lane to Shortland Street) Road Reconstruction 5/01/2017 1/06/2017 Road closure from midnight on the start date, to midnight on the finish date.
Auckland Central, Pakenham St West (Halsey St to Daldy St) Road Reconstruction 9/05/2016 31/03/2017 Road closure from midnight on the start date, to midnight on the finish date.
Auckland Central, St Paul St (Governor Fitzroy Pl to Symonds St) Repairs to Structure 19/02/2017 19/02/2017 Road closure from 8am on the start date, to 5pm on the finish date. Contingency dates Sunday 26th Feb or 5th March 2017. No vehicle access beyond the road closure point. Pedestrian access only.
Auckland Central, Swanson St/Albert St intersection City Rail Link Construction - Service relocation 23/02/2017 1/04/2017 One direction detour. Stop/Go controls as necessary. Delays possible.
Auckland Central, Symonds St (Karangahape Rd to Parliament St) Road Resurfacing - Asphalt 5/03/2017 6/03/2017 One-way detour, Stop/Go or contraflow.
Auckland Central, Tinley St (Tooley St to Plumber St) Road Resurfacing - Asphalt 8/03/2017 9/03/2017 Road Closure - Night - Detours - 7pm to 5am
Auckland Central, Tyler Street (Queen St to Commerce St) Pavement Surface Colouring 19/02/2017 23/02/2017 Road closure from 7pm to 6am (Each Night). Contingency dates will be 26/2/17 - 2/3/17
Auckland Central, Victoria St (Queen St to Hobson St) City Rail Link preliminary works - Service Relocation 1/01/2017 1/09/2017 Lane Closure. Stop/Go controls as necessary. Delays possible
Auckland Central, Wellesley St City Rail Link preliminary works - Service relocation 1/01/2017 1/08/2017 Lane Closure. Stop/Go controls as necessary. Delays possible
Auckland Central, Wolfe St (Albert St to Federal St) Road Improvements 21/02/2017 3/03/2017 Road closure from midnight on the start date, to 11pm on the finish date.
Auckland Central, Wolfe St (Albert St to Federal St) City Rail Link Construction - Piling 23/02/2017 15/03/2017 Road closed 24 hours per day
Avondale, Sandy Lane Private Development 19/10/2016 28/03/2017 Site Access Point to development
Avondale, Ash Street (Rita Bridge - Mc Donalds) Footpath Renewal 20/02/2017 1/04/2017 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Avondale, Ash Street (Rosebank Road to Great North Road ) Resurfacing Asphalt 5/03/2017 8/03/2017 Stop/Go - one lane closed
Avondale, Blockhouse Bay Road (Craddock to New North Road ) Resurfacing Asphalt 28/02/2017 5/03/2017 Stop/Go - one lane closed
Avondale , New North Road (Bollard Avenue) Resurfacing Asphalt 14/03/2017 14/03/2017 Stop/Go - one lane closed
Bayview, Spinnella Drive  Road Reconstruction - Reseal 26/02/2017 28/02/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Birkenhead, Park Ave (#20 & #34) Private Development 15/01/2016 30/02/2017 Site Access Point to development
Blockhouse Bay, Shipton Place (Donovan-Cul De Sac) Footpath Renewal 30/01/2017 28/02/2017 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Blockhouse Bay, Taylor Street (Wolverton to Busby) Resurfacing Asphalt 15/03/2017 15/03/2017 Stop/Go - one lane closed
Brookby, Twilight Rd Stab patches 27/02/2017 5/03/2017 Shoulder Closure - Stop/Go as necessary
Brookby, Clevedon, Twilight Rd, Alfriston Ardmore Rd, Clevedon Takanini Rd Road Rehabilitation Project 27/02/2017 5/03/2017 Shoulder Closure - Stop/Go as necessary
Browns Bay, Deverell Pl (Whole Rd) Footpath Work - Footpath Renewal 1/03/2017 17/03/2017 Lane Closure. Stop/Go controls as necessary. Delays Possible.
Bucklands Beach, Morrow Ave Road Resurfacing 21/02/2017 21/02/2017 Lane Closure. Stop/Go. Impact to traffic
Bucklands Beach, Takutai Ave Footpath Maintenance 21/02/2017 21/02/2017 Shoulder Closure. Stop/Go if required. Minor impact to traffic (Berm & footpath)
Bucklands Beach, The Parade Carpark Road Resurfacing 21/02/2017 21/02/2017 Lane Closure. Stop/Go. Impact to traffic
Castor Bay, Beach Road (Peter to Aberdeen) Road Maintenance - Pavement Rehab 9/01/2017 12/03/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Clevedon, Murphys Road (Redoubt Road to Flat Bush School Road) Road Maintenance 18/02/2017 20/02/2017 Road closure from 5am on the start date, to 5am on the finish date. Contingency dates - next avaliable shift
Clevedon, North Rd, Orere Point Rd, Orere Matingarahi Rd, Ingram Rd Drainage 27/02/2017 5/03/2017 Stop/Go controls/unattended post work
Clevedon, Thomas Road (Murphys Road to Adamson Road) Road Maintenance 18/02/2017 20/02/2017 Road closure from 5am on the start date, to 5am on the finish date. Contingency dates - next avaliable shift
Dairy Flat, Horse Shoe Bush Road - Site 2 Rehab 27/02/2017 10/03/2017 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Elerslie, Pukerangi Cres Kerb & Channel Renewal (day works) 22/02/2017 24/03/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Elerslie, Robert St Footpath & Kerb & Channel Renewal (day works) 28/01/2017 17/03/2017 Shoulder Closure - Stop/Go as necessary
Ellerslie, Baileys Road Footpath and Kerb & Channel Renewal - remedial works (day works) 4/01/2017 3/03/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Ellerslie, Marua Road Footpath and Kerb & Channel Renewal (day works) 15/02/2017 17/03/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Favona, Mahunga Drive (Entrance to Market Cove development) (#56) Private Development 25/07/2016 30/04/2017 Site Access Point to development
Flat Bush, Murphys Road - Redoubt Rd to Flat Bush School Rd Rehabilitation 19/02/2017 20/02/2017 Day & Night Time Road Closure. Impact to traffic
Flat Bush, Thomas Road Footpath Maintenance 22/02/2017 24/02/2017 Shoulder Closure. Stop/Go if required. Minor impact to traffic (Berm & footpath)
Glen Eden, Clayburn Road (Brandon Rd - Claywest) Footpath Renewal 20/02/2017 25/03/2017 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Glen Innes, Fenchurch Street Stage 2 - Aveline Place (End of cul-de-sac) Private Development 26/04/2016 1/05/2017 Site Access Point at end of cul-de-sac
Glen Innes, Linthorpe Cres (6/7 Linthorpe Crescent to Leybourne Circle) Pipeline Installation 13/02/2017 23/02/2017 Road closure from 7am on the start date, to 7am on the finish date. Resident access maintained, speak to Traffic controller.
Glenbrook, McLarin Road Private Development 1/12/2016 29/05/2017 Site Access Point to development
Glendowie, Crossfield Road Footpath & Kerb & Channel Renewal (day works) 9/01/2017 24/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Glendowie, West Tamaki Road Pavement patch repair (day works) 13/02/2017 24/02/2017 Lane Closure. Stop/Go controls as necessary. Delays Possible.
Glenfield, Glenfield Road Road Reconstruction - Kerb Relocation 27/02/2017 4/03/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Golflands, West Fairway Road Resurfacing 23/02/2017 23/02/2017 Lane Closure. Stop/Go. Impact to traffic
Hauapi, Matua Road Seal Repairs 27/02/2017 27/02/2017 Stop/Go controls as necessary. Minor Impact.
Henderson, Posa Ave (Bruce Mclaren - End Cul De Sac) Footpath Renewal 20/02/2017 25/03/2017 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Henderson, Waitakere Rd (Swanson Rd - Taupaki Rd) Digout 28/02/2017 28/02/2017 Stop/Go - one lane closed
Highland Park, Aviemore Drive - between Amerce Pl & Aberfeldy Ave Footpath Maintenance 19/02/2017 24/02/2017 Night Time Shoulder Closure. Stop/Go if required. Minor impact to traffic (Berm & footpath)
Hillcrest, Eban Ave Road Reconstruction - Footpath and K&C 27/02/2017 5/03/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Hillsborough, Hillsborough (Delargey to Herd Rd) Footpath Work - Footpath Kerb & Channel 22/02/2017 6/03/2017 One direction detour. Traffic Signal controls as necessary. Delays possible.
Hillsborough, Hillsborough Rd (Hibiscus Place to Hillside Road) Road Resurfacing - Asphalt 28/02/2017 3/03/2017 One-way detour, Stop/Go or contraflow.
Hillsborough, Hillsborough Rd (Marie Pl to Budock St) Road Resurfacing - Asphalt (mill & fill) 4/03/2017 4/03/2017 One-way detour, Stop/Go or contraflow.
Hobsonville, Brigham Creek Road Interchange Stormwater Works 27/02/2017 6/03/2017 Road works - expect delays
Hobsonville, Clark Road (#141) Private Development 10/02/2016 31/07/2017 Site Access Point to development
Hobsonville, Clark Road (94 Clark Road to 132 Clark Road) Road Reconstruction 20/02/2017 30/03/2017 Road closure from 7am on the start date, to 7am on the finish date. Contingency Dates 31/03/17 to 30/04/17.
Hobsonville, Scott, Road (#17) Private Development 30/11/2015 28/04/2017 Site Access Point to development
Howick, Covina Place Road Resurfacing 20/02/2017 20/02/2017 Lane Closure. Stop/Go. Impact to traffic
Howick, Eaglen Place Road Resurfacing 22/02/2017 22/02/2017 Lane Closure. Stop/Go. Impact to traffic
Howick, Edendale Road Road Resurfacing 20/02/2017 20/02/2017 Lane Closure. Stop/Go. Impact to traffic
Howick, Vida Place Footpath Maintenance 20/02/2017 21/02/2017 Shoulder Closure. Stop/Go if required. Minor impact to traffic (Berm & footpath)
Huapai, Tapu Road (1A) Private Development 10/10/2016 1/05/2017 Site Access Point to development
Kelston, St. Leonard Rd (Sabulite Rd - Barbary Ave) Mill and Fill 1/03/2017 1/03/2017 Stop/Go - one lane closed
Kingsland, Stormont Pl (New North Rd to End) Footpath Work - Footpath Kerb & Channel 13/03/2017 6/03/2017 Generic shoulder closure.
Komokoriki, West Coast Road - Opposite #636 Retaining Wall 9/02/2017 10/03/2017 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Kumeu, Oaia Road Drainage 6/03/2017 6/03/2017 Stop/Go controls as necessary. Minor Impact.
Lucas Heights, Hobson Road Road Reconstruction - Rehab 27/02/2017 5/03/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Mangere, Bader Drive Footpath, Kerb and Road renewal 19/02/2017 23/02/2017 Night time Lane closure, Diversions in place.
Mangere, Island Road (Greenwood Road to Michael Ford Road) Pipeline Installation 1/10/2016 28/02/2017 Road closure from 7am on the start date, to 7pm on the finish date.
Mangere, Kirkbride Road (#8) Private Development 29/09/2016 1/03/2017 Site Access Point to development
Mangere, Wedgwood Ave, Ganges Ave Water Supply Works 9/01/2017 31/03/2017 Road works - minimal delays
Manurewa, Adams Rd Preseal 27/02/2017 7/03/2017 Stop/Go controls as necessary. Delays Possible.
Manurewa, Alfriston Rd Reseal 26/02/2017 27/02/2017 Stop/Go controls as necessary. Delays Possible.
Manurewa, Great South Rd (Myers to Mahia) Reseal 28/02/2017 2/03/2017 Stop/Go controls as necessary. Delays Possible.
Manurewa, Lyndon Pl Preseal 27/02/2017 7/03/2017 Stop/Go controls as necessary. Delays Possible.
Manurewa, Mill Rd Water Cutting 1/03/2017 1/03/2017 Stop/Go controls as necessary. Delays Possible.
Manurewa, Orams Road (Peguero Place to David Avenue) Road Improvements 22/04/2017 22/09/2017 Road closure from 7am on the start date, to 7am on the finish date. No Exit at the intersection of David Avenue and at the intersection of Peguero Place.
Manurewa, Rosscommon Rd Road Reconstruction 1/03/2017 5/03/2017 Stop/Go controls as necessary. Delays Possible.
Manurewa, Stratford Rd Road Reconstruction 26/02/2017 2/03/2017 Stop/Go controls as necessary. Delays Possible.
Massey, Backhurst Grove (Royal Rd to End) Mill and Fill 3/03/2017 3/03/2017 Stop/Go - one lane closed
Massey, Cyclarama Cres (Royal Rd to End) Footpath Renewal 30/01/2017 4/03/2017 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Massey, Keegan Dr (Waimumu Road to Triangle Road) Road Maintenance 13/03/2017 13/03/2017 Road closure from 8am on the start date, to 4pm on the finish date. Contingency Dates 13 to 17 March 2017. Resident access maintained, speak to Traffic controller. Car parking restrictions apply.
Massey, Reverie Place (Beauchamp Drive - End) Footpath Renewal 30/01/2017 4/03/2017 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Massey, Reverie Place (Beauchamp Drive - End) Mill and Fill 2/03/2017 2/03/2017 Stop/Go - one lane closed
Meadowbank, Dorchester St Resurfacing - Chip Seal (day works) 22/02/2017 23/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Meadowbank, Gowing Dr Resurfacing - Chip Seal (day works) 22/02/2017 23/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Meadowbank, Houghton St Road Resurfacing 22/02/2017 23/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Mellons Bay, Burford Road Footpath Maintenance 20/02/2017 20/02/2017 Night Time Shoulder Closure. Stop/Go if required. Minor impact to traffic (Berm & footpath)
Mellons Bay, Micawber Place Footpath Maintenance 22/02/2017 23/02/2017 Shoulder Closure. Stop/Go if required. Minor impact to traffic (Berm & footpath)
Milford, East Coast Rd (Gordon Rd to Shakespear Rd) Road Resurfacing - Asphalt Resurfacing 23/02/2017 2/03/2017 Night time lane closure, Stop/Go controls as necessary. Delays Possible.
Milford, Omana Road (Kitchener Road to Ihumata Road) Road Maintenance 28/02/2017 1/03/2018 Road closure from 7pm on the start date, to 5am on the finish date. Contingency dates until 9th March 2017 (no closures on Friday or Saturday nights)
Milford, Shakespeare Road (Kitchener Road to Alma Road) Road Maintenance 28/02/2017 1/03/2018 Road closure from 7pm on the start date, to 5am on the finish date. Contingency dates until 9th March 2017 (no closures on Friday or Saturday nights)
Morningside, Argyle St (Morningside Dr to Gordon Road) Footpath Work - Footpath Kerb & Channel 15/02/2017 24/02/2017 Contra-flows, one way detour.
Morningside, Inwood St (New North Rd to Western Springs Rd) Footpath Work - Footpath Kerb & Channel 7/02/2017 14/03/2017 Road closure, shoulder closure. (No works occurring on this street while we await Water Care repairs).
Morningside, Morningside Rd (New North Rd to Exeter Rd) Footpath Work - Footpath Kerb & Channel 27/02/2017 31/03/2017 Contra-flow. Delays possible.
Morningside, New North Rd (Kingsland Ave to Inwood St) Footpath Work - Footpath Kerb & Channel 9/01/2017 3/03/2017 Contra-flow, shoulder closures. Delays possible.
Mt Albert, Alberton Ave Footpath Work 7/02/2017 7/03/2017 Road works - expect delays
Mt Albert, New North Rd (Richardson Rd to Bollard Ave) Footpath Work - Footpath Kerb & Channel 21/02/2017 31/03/2017 Contra-flows. Delays possible.
Mt Roskill, Sandringham Road (Gifford Ave to Stoddard Road) Footpath Work 6/03/2017 6/05/2017 Road works - expect delays
Murrays Bay, Bournemouth Tce (Whole Rd) Footpath Work - Footpath Renewal 27/02/2017 17/03/2017 Lane Closure. Stop/Go controls as necessary. Delays Possible.
New Lynn, Croydon Road (Titirangi Road to Fruitvale Road) Road Maintenance 9/03/2017 10/03/2017 Road closure from 7pm to 5am (Each Night). Contingency dates until 16th March
New Lynn, Mccorquindale Lane (Totara Ave to Mccrae Way) Construction vehicle access 28/09/2016 22/08/2017 Road closure from 7am on the start date, to 5pm on the finish date. Closed on occasional days during this period.
New Lynn, Mccrae Way (Memorial Dr to Great North Road) Construction vehicle access 28/09/2016 22/08/2017 Road closure from 7am on the start date, to 5pm on the finish date. Closed on occasional days during this period.
New Lynn, Titirangi Road (at Willerton) Resurfacing Asphalt 13/03/2017 13/03/2017 Stop/Go - one lane closed
New Lynn, Titirangi Road (Parker - Croydon) Resurfacing Asphalt 12/03/2017 12/03/2017 Stop/Go - one lane closed
Newmarket, Edgerley Ave Footpath Work 26/09/2016 31/03/2017 Road works - expect delays
Northcote, Gladstone Ave Road Reconstruction - Footpath and K&C 1/03/2017 4/03/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Northcote, Raleigh Road Road Reconstruction - Test Pits 27/02/2017 1/03/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Northpark, Mission View Drive Road Resurfacing 23/02/2017 23/02/2017 Lane Closure. Stop/Go. Impact to traffic
Northpark, Oakridge Way Road Resurfacing 23/02/2017 23/02/2017 Lane Closure. Stop/Go. Impact to traffic
Northpark, Summermist Drive Road Resurfacing 23/02/2017 23/02/2017 Lane Closure. Stop/Go. Impact to traffic
Northpark, Travers Place Road Resurfacing 23/02/2017 23/02/2017 Lane Closure. Stop/Go. Impact to traffic
Onehunga, Amaru Road Footpath and Kerb & Channel Renewal - remedials (day works) 4/01/2017 3/03/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Onehunga, Church Street (23) Private Development 23/01/2017 10/07/2017 Site Access Point to development
Onehunga, Spring St Footpath & Kerb & Channel Renewal (day works) 16/02/2017 31/03/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Orakei, Kurahaupo St Resurfacing - Chip Seal (day works) 22/02/2017 23/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Orakei, Rautara St Resurfacing - Chip Seal (day works) 22/02/2017 23/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Orewa, Centreway Road Road Maintenance - Digouts 27/02/2017 3/03/2017 Lane Closure. Stop/Go controls as necessary. Delays Possible.
Otara, East Tamaki Road (at the intersection with Bairds Rd) Intersection Improvements 7/03/2017 9/03/2017 Road closure from 7pm to 5am (Each Night). Contingency dates: nights of 12/03/17 and 13/3/2017
Otara, Jarvis Way Preseal 22/02/2017 28/02/2017 Stop/Go controls as necessary. Delays Possible.
Otara, Otara Road (Bairds Rd to Bland Place) Road Maintenance 7/03/2017 8/03/2017 Road closure from 7pm on the start date, to 5am on the finish date. Contingency dates: night of 8 March.
Owairaka, Beagle Ave (Triton Avenue to O'Donnell Avenue) Bridge Replacement 27/02/2017 12/06/2017 Road closure from midnight on the start date, to midnight on the finish date. Residents access will be maintained at all times.
Owairaka, Richardson Rd (Maioro St to White Swan Rd) Footpath Work - Footpath Kerb & Channel 9/01/2017 24/02/2017 Contra-flow, shoulder closures. Delays possible.
Owairaka, Richardson Rd (Maioro St to White Swan Rd) Road Resurfacing - Asphalt 23/02/2017 27/02/2017 One-way detour, Stop/Go or contraflow.
Pahurehure, Pararekau Road (65 Pararekau Road to Island View Road) Stormwater improvement 30/01/2017 28/04/2017 Road closure from 7am on the start date, to 7pm on the finish date.
Pakuranga, Pennell Place Road Resurfacing 19/02/2017 20/02/2017 Night Time Road Closure. Stop/Go if required. Minor impact to traffic
Papakura, Beach Rd Road Reconstruction 20/02/2017 24/03/2017 Stop/Go controls as necessary. Delays Possible.
Papakura, Opaheke Rd Water Cutting 2/03/2017 2/03/2017 Stop/Go controls as necessary. Delays Possible.
Papakura, Tasman Dr Preseal 22/02/2017 3/03/2017 Stop/Go controls as necessary. Delays Possible.
Papakura, Tasman Dr Water Cutting 3/03/2017 3/03/2017 Stop/Go controls as necessary. Delays Possible.
Paremoremo, Attwood Road Road Reconstruction - Digouts 27/02/2017 5/03/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Parnell, Burrows St (St Stevens Ave to End) Footpath Work - Footpath Kerb & Channel 3/03/2017 6/03/2017 Contra-flow. Delays possible.
Parnell, Scarborough Tce (Ruskin St to Denby St) Water Supply improvement 31/01/2017 13/02/2017 Road closure from 8am to 5pm (each day). Contingency dates: 16 to 23 Jan
Penrose, Oranga Ave Footpath & Kerb & Channel Renewal (day works) 26/01/2017 24/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Penrose, South Eastern Highway (Eastbound) (Great South Road to Carbine Road) Road Maintenance 26/02/2017 3/03/2017 Road closure from 9pm to 6am (Each Night).
Penrose, South Eastern Highway (Westbound) (Carbine Road to Great South Road) Road Maintenance 26/02/2017 3/03/2017 Road closure from 9pm to 6am (Each Night).
Penrose, Wallath Road Footpath & Kerb & Channel Renewal (day works) 10/02/2017 24/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Pine Harbour, Tui Brae Water Supply Works 16/02/2017 16/04/2017 Road works - minimal delays
Ponsonby, Brown St (Richmond to Fitzroy) Footpath Work - Footpath Kerb & Channel 7/02/2017 3/03/2017 One direction detour. Traffic Signal controls as necessary. Delays possible.
Ponsonby, Ponsonby Rd (Franklin Rd to Williamson Ave) Footpath Work - Pedestrian Improvements project 27/02/2017 1/05/2017 Lane Closure. Stop/Go controls as necessary. Delays possible.
Ponsonby, Lincoln St (Ponsonby Rd to Mira Street ) Intersection Improvements 31/01/2017 19/02/2017 Road closure from 7am on the start date, to 7pm on the finish date. Contingency dates 20/02/17 - 5/03/17
Pukekohe, Seddon St, Blair Ave, Kitchener Rd, Wellington St Footpath Maintenance 27/02/2017 5/03/2017 Shoulder Closure - Stop/Go as necessary
Pukekohe, Adams Road South (Belmont Road to Huamanu Street) Road Improvements 16/02/2017 30/04/2017 Road closure from 7am to 7am (each day). Resident access maintained, speak to Traffic controller. Car parking restrictions apply.
Pukekohe, Belmont Road (Adams Rd South to Russell Rd) Road Reconstruction 22/05/2017 16/06/2017 Road closure from 7am on the start date, to 7am on the finish date. These road closures will progress by stages within these approximate date ranges, with detours in place as required.
Pukekohe, Belmont Road (Factory Road to Adams Rd South) Road Reconstruction 24/04/2017 19/05/2017 Road closure from 7am on the start date, to 7am on the finish date. These road closures will progress by stages within these approximate date ranges, with detours in place as required.
Pukekohe, Belmont Road (Factory Road to Adams Road South) Road Improvements 16/02/2017 30/04/2017 Road closure from 7am to 7am (each day). Resident access maintained, speak to Traffic controller. Car parking restrictions apply.
Pukekohe, Factory Road (no access to or from Belmont Rd) Road Reconstruction 27/02/2017 24/03/2017 Road closure from 7am on the start date, to 7am on the finish date. These road closures will progress by stages within these approximate date ranges, with detours in place as required.
Pukekohe, Factory Road (no access to or from Victoria St West) Road Reconstruction 27/03/2017 21/04/2017 Road closure from 7am on the start date, to 7am on the finish date. These road closures will progress by stages within these approximate date ranges, with detours in place as required.
Pukekohe, Victoria st West (Factory Rd to Domain Rd) Road Reconstruction 19/06/2017 14/07/2017 Road closure from 7am on the start date, to 7am on the finish date. These road closures will progress by stages within these approximate date ranges, with detours in place as required.
Remuera, St Marks Rd (Remuera Rd to Macmurray Rd) Footpath Work - Footpath Kerb & Channel 16/02/2017 28/02/2017 One direction detour. Traffic Signal controls as necessary. Delays possible.
Remuera, Victoria Ave Footpath & Kerb & Channel Renewal completion stage(day works) 9/01/2017 4/03/2017 On road car parking restrictions, possible property access delays, minor delays.
Silverdale, Andrew Jack Road (Watkinson Rd to Felling St) New Housing Development 6/07/2016 13/03/2017 Road closure from 7am on the start date, to 6pm on the finish date.
Silverdale, East Coast Rd (Forge Rd to Spur Rd) Road Resurfacing - Chip Seal Resurfacing 26/02/2017 26/02/2017 Lane Closure. Stop/Go controls as necessary. Delays Possible.
Silverdale, Hibiscus Coast Highway (Whangaparaoa Road to Titan Place) Road Resurfacing - Asphalt Resurfacing 19/02/2017 22/02/2017 Night time lane closure, Stop/Go controls as necessary. Delays Possible.
Somerville, Belgate Road Road Resurfacing 20/02/2017 20/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Bronte Place Road Resurfacing 21/02/2017 21/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Chiania Pl Road Resurfacing 22/02/2017 22/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Corridale Place Road Resurfacing 22/02/2017 22/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Haven Crest Road Resurfacing 21/02/2017 21/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Jane Eyre Drive Road Resurfacing 21/02/2017 21/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Nicholas Road Road Resurfacing 22/02/2017 22/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Sandalwood Pl Road Resurfacing 22/02/2017 22/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Simmental Cres Road Resurfacing 22/02/2017 22/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Tumbridge Place Road Resurfacing 21/02/2017 21/02/2017 Lane Closure. Stop/Go. Impact to traffic
Somerville, Winton Court Road Resurfacing 20/02/2017 20/02/2017 Lane Closure. Stop/Go. Impact to traffic
South Head, South Head Road Drainage 8/03/2017 8/03/2017 Stop / Go controls as necessary. Minor Impact.
St Helliers, Ashwell St/Whytehead Kerb & Channel Renewal (day works) 23/02/2017 24/03/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
St Helliers, Rarangi Ave Kerb & Channel Renewal (day works) 9/02/2017 24/02/2017 Lane Closure. Stop/Go controls as necessary. Minor impact.
Stanmore Bay, Cedar Tce Road Maintenance - Digouts 27/02/2017 28/02/2017 Lane Closure. Stop/Go controls as necessary. Delays Possible.
Swanson, Birdwood Road (Swanson Road to Glen Road) Road Maintenance 7/02/2017 10/03/2017 Road closure from 7am on the start date, to 7pm on the finish date. Contingency dates 13/03/17 - 18/03/17
Swanson, Birdwood Road (Swanson Rd to Waitemata Dr West) Road Rehab 23/01/2017 31/03/2017 One way detour
Swanson, Larnoch Rd (Swanson Rd - Rathgar Rd) Footpath Preseal Repair 30/01/2017 25/02/2017 Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Takapuna, Lake Pupuke Drive (Lomond St to Killarney St) Crane Operation 11/03/2017 12/03/2017 Road closure from 7am to 6pm (each day). Contingency Date: 2 days between 13th and 18th march Resident access maintained, speak to Traffic controller. Car parking restrictions apply.
Takapuna, Lake Road/Jutland Road Gas works 31/10/2016 30/04/2017 Road works - expect delays
Tauhoa, Tauhoa Road - Sounds Bridge Bridge Repairs - Drainage, Concrete Repairs, Timber Repairs, Painting 8/02/2017 3/03/2017 Shoulder Close and Lane Closure. Stop/Go controls as necessary. Delays possible.
Te Atatu, McLeod Road (Te Atatu Road - Great North Road) Resurfacing Chipseal 27/02/2017 27/02/2017 Stop/Go - one lane closed
Te Atatu Peninsula , Waipani Rd (Te Atatu Road - Beach Rd) Digout 1/03/2017 2/03/2017 Stop/Go - one lane closed
Te Atatu South, Grainger Rd (Flanshaw - Vera Rd) Digout 27/02/2017 27/02/2017 Stop/Go - one lane closed
Te Atatu South, Millbrook Road (View Rd - Awaroa) Road Rehab 22/01/2017 4/03/2017 One way detour
Te Atatu South, Royal View Road (Royal View Road - Flanshaw Street) Installation of pre-cast traffic island 27/02/2017 27/02/2017 Four way stop-go
Te Atatu South, Strid Rd (Edmonton Rd - Essex Rd) Digout 3/03/2017 3/03/2017 Stop/Go - one lane closed
Three Kings, Mount Eden Road (985 ) Private Development 11/01/2016 31/03/2017 Road works - expect delays
Titirangi, Kohu Road (Kopiko Rd to Titirangi Rd) Road Maintenance 19/03/2017 20/03/2017 Road closure from 7pm on the start date, to 5am on the finish date. Contingency date until Wednesday 26th March 2017 (No Closures on Friday or Saturday)
Titirangi, Otitori Bay Road (Park Road - Tanekaha Road) Mill and Fill 27/02/2017 27/02/2017 Stop/Go - one lane closed
Titirangi, Otitori Bay Road (Park Road - Tanekaha Road) Resurfacing Chipseal 1/03/2017 1/03/2017 Stop/Go - one lane closed
Titirangi, Scenic Dr (Woodlands Park Rd to Titirangi Rd) Road Maintenance 19/03/2017 20/03/2017 Road closure from 7pm on the start date, to 5am on the finish date. Contingency date until Wednesday 26th March 2017 (No Closures on Friday or Saturday)
Unsworth Heights, Meadowood Drive Road Reconstruction - Reseal 26/02/2017 27/02/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Wainui, Grayson Road (Cemetery Rd to the end of Grayson Rd) Road Improvements 19/12/2016 31/03/2017 Road closure from 7am to 5pm (each day).
Wairau Valley, Porana Road Road Reconstruction - Reseal 28/02/2017 28/02/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Waitakere, Bethells Road (Long Rd - Te Aute Ridge Rd) Mill and Fill 28/02/2017 28/02/2017 Stop/Go - one lane closed
Waitakere, West coast Road (Waitakere) Resurfacing Chipseal 28/02/2017 28/02/2017 Stop/Go - one lane closed
Waitakere, The Parade (Waitakere) Resurfacing Chipseal 2/03/2017 2/03/2017 Stop/Go - one lane closed
Waitakere, Victory Road (Waitakere) Resurfacing Chipseal 3/03/2017 3/03/2017 Stop/Go - one lane closed
Warkworth, Hudson Road - Near # 30 Retaining - Construction 13/02/2017 25/03/2017 Lane Closure. Stop / Go controls as necessary. Minor Impact.
Wellsford, Birdsall Road - No. 2 Bridge Bridge Repairs - Timber Repairs 27/02/2017 27/02/2017 Stop/Go controls as necessary. Minor Impact.
Wellsford, Wayby Station Road - Grants Bridge (RP 3958) Rehab - Prep Work Bridge Approaches 6/03/2017 10/03/2017 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Wellsford, Wayby Station Road - Wayby Bridge (RP 2065) Rehab - Prep Work Bridge Approaches 6/03/2017 10/03/2017 Lane Closure. Stop/Go controls as necessary. Minor Impact.
Whenupai, Brigham Creek Road Road Reconstruction - Rehab 27/02/2017 31/05/2017 Weather permitting** Stop/Go or Contra flow during off peak period, minor impact to traffic (Berm & footpath)
Wiri, Pacific Events Drive (8) Private Development 10/10/2016 26/03/2017 Site Access Point to development