Great North Road improvements Great North Road improvements

Auckland Transport (AT) is delivering walking, cycling and bus improvements along Great North Road, between Ponsonby Road and Crummer Road. The changes make the street safer for all users, especially those walking or cycling.


Project updates

December 2024

Work on Great North Road will last from January 2025 to late-2025. To finish as quickly as possible, we’ll work in stages along the route. This means we’ll work in 2 locations at a time.

The first work areas are:

  • between Northland Street and Elgin Street
  • between Maidstone Street and Ponsonby Road.

We will work at the busy Ponsonby Road end of the route during January and February. These months have the lowest amount of traffic.

Work staging plan

The timelines may change. To receive updates, email projects@at.govt.nz

In the subject line, write, ‘GNR updates’.

Road closures along Great North Road colour coded by date of closure.

To view the project timeline in more detail, download the work staging plan (PDF, 146KB).

Driving on Great North Road

We will always keep one lane open in each direction on Great North Road. We will need to close the tops of side roads while we work on their intersections with Great North Road. We will keep locals updated when work will be taking place near them.

Local businesses and public transport

Buses will be running, and businesses will be open. Follow the directions around our worksites.

Confirming on-street parking

At the top of the side roads along the route all on-street parking is retained.

On Great North Road we will remove some parking to make room for:

  • new bus stops
  • pedestrian crossings
  • more loading zones, including for car transporters.

It is also to make it safer for cars turning into and out of side streets – parked cars can make it harder for drivers to see.

We want to make it easy to find a park. We also want customers, visitors, employees and residents to all be able to share the space. We are proposing a mix of time-restricted and paid parking along Great North Road and at the top of side streets. We are reviewing our proposal and will seek feedback before finalising our plans.

Project resources

To view live journey times, visit the Mooven website (opens in a new tab).

For more information about the project, read the construction fact sheet (PDF, 256KB).

Contact us

If you have any queries or concerns about this project, please contact AT by: 


Project overview

The benefits of the project will include:

  • more reliable public transport supported by better facilities
  • easier, safer travel on foot, by bike or by car
  • retained road capacity and traffic flow
  • better access for deliveries
  • improved amenities and streetscape
  • support for the growing residential population.


Project background

Great North Road is a major Auckland corridor, carrying large numbers of people in and out of the City Centre. The area is changing, with more residential apartments being built. Around the project’s section of Great North Road, the population is expected to grow approximately 24% by 2031.

Improved access to reliable public transport and safe walking and cycling are key, as many new developments have limited access to private vehicles. By making public transport, walking and cycling safer and more attractive, we can create better-connected communities and give people more options for how they move around the city.

Over the past 5 years (2019 to 2023), there have been 84 collisions. As part of the project, we will address road-user safety with road resurfacing, maintenance and intersection upgrades.

Project timeline

  • 2016: consultation on a cycleway and improvements to Great North Road
  • 2017 to 2021: design development and community engagement (project delayed due to Covid-19 restrictions)
  • 2021: consultation on an updated design
  • 2022: community re-engagement in advance of construction
  • September 2023 to March 2024: preparatory works (stage 1)

Street design

 

View of a city street with a cyclist riding in a green painted lane next to a tree-lined kerb
View towards the city from the intersection with Beaconsfield Street.

 

The improvements include a protected cycleway, new and better-designed bus stops, pedestrian crossings and new loading zones. These changes will make accessing Great North Road safer and easier, whether by foot, bike, bus or car.

Bus lanes will be extended to cover the entire route, in operation from 7am to 10am and 4pm to 7pm, Monday to Friday. Eight new bus stops will be built, with safe access across the cycleway to a waiting area. Some existing bus stops will be moved, to be closer to pedestrian crossings and improve bus efficiency where stops are currently a short distance from each other.

Raised tables and kerb build-outs on side streets and 2 new signalised pedestrian crossings will improve safety for people moving around Great North Road, including children at local schools. To create space for bus lanes and the cycleway, we’ve removed the flush median along the route, but drivers will still be able to turn right to access side streets and businesses. Great North Road will also be a greener street, with around 60 native trees.

Detailed design

As part of the design process, we assessed all elements from a safety perspective, considering the needs of all road users to ensure that the project is delivered in a pragmatic way. We determined that the signalised crossings on Great North Road (including the 2 new crossings) achieve the desired safety outcome without the need for speed tables. The design remains otherwise unchanged and includes adding raised tables to 23 side-street entrances.

To view the final design, download the proposal drawing (PDF, 9MB).

Parking

Through consultation with the Great North Road business community, we’ve heard that on-street parking near to shops and businesses is important. Along the 1.65km route, we’ve retained parking where possible but have prioritised safety, accessibility, and the movement of people and goods.

We’ve also worked with businesses to ensure access for deliveries is reflected in the new street design, including the introduction of 5 large loading zones suitable for vehicle transporters.

Since public consultation in 2021, we’ve removed several parking spaces on Great North Road after a review of sightlines showed that cars parked in these spaces obscure visibility for people turning from side streets.

To address this, we are investigating time restrictions and paid parking on side streets. This will offer flexibility in length of stay and make it easier to find a parking space along the corridor. This will not affect existing residential parking zones.

Where installing speed tables and kerb build-outs at side-street entrances affects parking spaces, changing parallel parking to horizonal parking will ensure we retain the same number of spaces.

Trees and planting

Around 217 native trees and landscaping and 5,000 plants will be planted. This will replace 23 trees being removed to accommodate the new street design. Species to be planted include tītoki, rewarewa, cabbage tree, kānuka, pōhutukawa, horoeka, nikau and kōwhai. Each new tree will include low-level planting around its base. Bus stops and kerb build-outs will also be landscaped with species including rengarenga, maurea, toitoi, coprosma, koromiko and flax.

Safety

This project was designed to significantly improve safety along this stretch of road. Between 2014 and 2019, there were 11 serious injuries along the route. There have been 139 recorded crashes in this timeframe, with more than 80% occurring at intersections.

Crashes involving vulnerable road users were clustered around intersections, with 13 crashes involving motorcyclists, 7 crashes involving pedestrians and 7 crashes involving people on bikes.

By installing a cycleway, crossings and raised tables across side streets, the project will make travel safer for everyone, especially vulnerable road users.

Strategic context

Auckland Transport’s strategic network plan, Future Connect, identifies this section of Great North Road as having strategic importance for people walking, cycling, driving and using public transport.

This project also helps deliver on The Auckland Plan. The Plan calls for improving the “safety, personal security and attractiveness of walking and cycling alternatives” and “investing in and integrating public transport and walking and cycling networks to provide convenient and efficient alternatives.”


Public feedback

Consultation was open from March to May of 2021. We received 274 submissions through our online survey, feedback forms and email. We also received 192 data-drops on the social pinpoint platform.

Download public feedback report (PDF, 1.26MB)

Original proposal – August 2017

Read more about the original proposal Route 4: Great North Road.