Skip to main content
Last updated
Project status Construction

Project details

Start date

October 2025

End date

December 2026

Location

Papatoetoe

Transport involved

Walking, driving and cycling

Overview

Buckland Road (west of Franklin Avenue)

For safer crossings, we will:

  • upgrade the existing zebra crossing to traffic lights with a cycle and pedestrian crossing. The traffic lights will only be activated by someone waiting to cross the road
  • widen kerb ramps, footpaths and shared paths at the crossing on Buckland Road and Franklin Avenue
  • install tactile yellow pavers to help visually impaired pedestrians.

Buckland Road and Portage Road intersection (including nearby side roads - Franklin Avenue and Park Avenue)

For smoother and safer traffic flow, we will:

  • replace the current give-way intersection with a new roundabout
  • realign kerblines and widen traffic islands to improve traffic flow
  • add a dedicated right-turn waiting space and ‘keep clear’ markings on Portage Road to help with turning from Park Avenue to Portage Road
  • restrict right turns from Park Avenue to Portage Road (drivers can use the roundabout for U-turns).

For cyclist and pedestrian safety, we will:

  • install electronic warning signs on Portage Road to tell drivers about approaching cyclists
  • add a new cyclist and pedestrian crossing on Portage Road (south of the roundabout) and new cycle ramps and shared paths for safer navigation
  • reprioritise two spaces on Franklin Avenue and three on Park Avenue as “no stopping at all times” zones to improve visibility at crossings.

Timeline

Public engagement

Completed
November 2025

We asked the public for their feedback on our plans.

Construction starts

In progress
May 2026

We will begin work on improvements in May 2026.

Project designs

Project benefits

Safer streets

The new signals will make it safer for tamariki and pedestrians to cross Buckland Road and supports walking and cycling as safe, practical options.

Improved traffic flow

The roundabout will reduce the risk of crashes at a busy intersection and improve traffic flow and reduce driver confusion.

Project background

These improvements are a joint initiative between the Ōtara-Papatoetoe Local Board and AT. By combining two nearby projects into one, we can reduce costs, minimise disruption, and deliver safer, well-integrated upgrades for the community.

Why are we making these changes?

Community concerns: Drivers often fail to stop at the existing zebra crossing on Buckland Road, creating risks for pedestrians.

Safety: The Buckland Road / Portage Road intersection can be confusing and difficult to navigate, increasing the chance of crashes.

Protecting vulnerable users: Many tamariki and cyclists use these routes to get to school, the park and shops.

Future-proofing: Upgrading crossings and intersections helps manage growing traffic volumes and supports active transport.