Clevedon-Kawakawa Road safety improvements
We are proposing to improve safety at high‐risk bends along the Clevedon-Kawakawa Road Corridor.
On this page
Project details
Start date
2026End date
2027Location
Clevedon-Kawakawa Road, Clevedon and Kawakawa BayTransport involved
DrivingOverview
We are planning to improve safety at high-risk bends along the Clevedon-Kawakawa Road corridor.
This project includes a series of cost-effective measures that aim to reduce the risk associated with vehicles losing control. This will help ensure drivers can safely navigate through these high-risk locations.
What we're proposing and where
Improve the road surface on the approach to and through the bend to enhance skid resistance:
- Holdens Road intersection
- Ness Valley intersection
- 476 Clevedon-Kawakawa Road
- between 659 and 661 Clevedon-Kawakawa Road
- 1331 Clevedon-Kawakawa Road.
Install Active Warning Signs (AWS) to encourage safe and appropriate speeds:
- 250m east of 102 Clevedon-Kawakawa Road (eastbound)
- 10m east of 411 Clevedon-Kawakawa Road (westbound).
Re-mark existing road markings to guide motorists more effectively.
Reseal driveways and shoulders to prevent gravel migration and where possible, widen the shoulders:
- 262 Clevedon-Kawakawa Road
- 270 Clevedon-Kawakawa Road
- 287 Clevedon-Kawakawa Road
- 300 Clevedon-Kawakawa Road
- 390 Clevedon-Kawakawa Road
- 370 Clevedon-Kawakawa Road
- 410 Clevedon-Kawakawa Road
- 764 Clevedon-Kawakawa Road
- 782 Clevedon-Kawakawa Road
- 790 Clevedon-Kawakawa Road
- 800 Clevedon-Kawakawa Road
- 806 Clevedon-Kawakawa Road
- 810 Clevedon-Kawakawa Road
- 1168 Clevedon-Kawakawa Road.
View the plans in 'Project Designs' to see more detail about each location.