Grande Vue Road and Hill Road intersection improvements
We expect construction to take place from 25 October to 9 December 2026. We will work between 9pm and 6am each day.
Project details
Start date
25 October 2026End date
9 December 2026Location
ManurewaTransport involved
Walking, driving, bus and cyclingOverview
In October 2024, we proposed changes to the intersection of Grande Vue Road and Hill Road and access to the State Highway 1 motorway on-ramp.
The changes would:
- improve pedestrian safety for those walking to the Auckland Botanic Gardens, local shops, and eateries
- improve road operation
- include two new lanes on Grande Vue Road to the motorway
- remove the confusion at the Grande Vue Road and Hill Road intersection because of the unusual layout, where left-turning traffic from Hill Road has priority over right-turning traffic.
Our proposal was developed with the New Zealand Transport Agency to address community safety concerns.
After carefully reviewing the feedback we received, we are proceeding with a minor change requested by the community.
We explored options to keep some parking on Hill Road and have confirmed:
- three parking spaces will be kept at 80 and 82 Hill Road
- a clearway restriction may be introduced during the morning peak period if required, following monitoring.
All other proposed changes will remain the same.
If you have any queries about the construction works, email Imraan Mohammed at imraan@agileinfrastructure.co.nz.
Key documents
Proposal plan October 2024
Feedback summary report
Works notification letter October 2026
Project benefits
Improved safety
Easier crossing for pedestrians
Better access to local places
Smoother traffic flow
Project background
- Installing traffic lights at the intersection of Grand Vue Road and Hill Road to help manage traffic on this busy intersection and give priority to people on foot to cross the road when needed - the new traffic lights will be co-ordinated with the nearby on-and-off ramps signals and monitored alongside the ramp signals to maximise efficiency.
- Creating two traffic lanes on Grande Vue Road to the SH1 on-ramp for ease of access to the SH1 motorway on-ramp.
- Rebuilding footpaths and install yellow tactile pavers at the crossing points to help people find their way to crossings and safely cross the road.
- Installing new traffic islands and kerb ramps at the intersection of Grande Vue Road with SH1 on ramp.
- Removing some parking to accommodate the intersection changes.
- Treating the approaches to the intersection of Grande Vue Road with the SH1 on-ramp to a skid-resistant road surface.
- Installing new signage and paint new road markings to support the proposed changes.