Skip to main content

Media contact

For all media enquiries please contact the AT media team.

Media releases

Showing 101 to 110 of 318 media results

Meeting the need with a new bus service for Papakura and Takaanini

With more and more South Aucklanders wanting to travel by public transport, Auckland Transport is moving to meet the need of those in the Papakura and Takaanini areas. Date: 04 July 2025

Second phase of bikes in buses trial begins - cyclists can now cross the Auckland Harbour Bridge

Auckland Transport (AT) is gearing up for the next phase of its bikes in buses trial from July 2025, aiming to make public transport more flexible, and enable a variety of active modes of travel. Date: 17 June 2025

Matariki Weekend rail closure – getting one step closer to CRL

Major rail upgrades to bring more frequent and reliable services mean no trains will be running from Friday 20 June to Monday 23 June 2025, as essential upgrade works are carried out across the city’s rail lines over the extended Matariki long weekend. Date: 13 June 2025

King’s Birthday rail closure - Critical upgrades to prepare for CRL

Major rail upgrades to bring more frequent and reliable services mean no trains will be running from Friday 30 May to Monday 2 June, say Auckland Transport and KiwiRail. Date: 27 May 2025

Football Fever – Show your pride with Auckland’s ride

Auckland Transport is throwing its support behind Auckland FC as the Black Knights continue their charge to capture football’s A League crown in their inaugural season. Date: 21 May 2025

More traffic expected for Mt Wellington, NZTA and AT plans in full swing

Auckland Transport (AT) and the NZ Transport Agency Waka Kotahi (NZTA) are collaborating to tackle congestion in Mt Wellington. Date: 13 May 2025

Auckland Transport’s plan to help ease afternoon congestion in Epsom and Greenlane

Auckland Transport (AT) wants to make time changes to both T3 lanes along Manukau Road and Pah Road in Epsom, and a bus lane on Great South Road in Greenlane, to keep our city moving. Date: 13 May 2025

Construction on Eastern Busway kicks into next gear

Construction of New Zealand’s first busway along the middle of a major urban road is moving ahead – which will mean faster and reliable buses for East Auckland. Date: 08 May 2025

Safe rail bridges coming for Glen Innes, Takaanini and Te Mahia

Three Auckland train stations where there have been dozens of near misses between pedestrians and trains during the past decade will have their pedestrian level crossings replaced by modern, accessible overbridges, Auckland Transport (AT) says. Date: 07 May 2025

Deputy Mayor and the Minister for Auckland turn the first sod for final section of Te Ara Ki Uta Ki Tai (Glen Innes to Tāmaki Drive shared path)

Auckland is one step closer to having a safe, accessible and iconic path connecting the Eastern Bays and city centre as work begins on the final stage of Te Ara Ki Uta Ki Tai – the Glen Innes to Tāmaki Drive shared path. Date: 02 May 2025

Related Content