Te Mahia Station pedestrian bridge
We’ve made it easier and safer to access Te Mahia Station by building a new pedestrian bridge. The new pedestrian bridge will open on Monday 24 August 2026.
On this page
Project details
Start date
September 2025End date
August 2026Location
Te Mahia StationTransport involved
Walking, train and cyclingOverview
The new pedestrian bridge replaces the previous rail level crossing, providing a more direct and safer connection to the station from Great South Road and Ferguson Street.
The new bridge will reopen access to the station from Ferguson Street.
It also provides better accessibility options, with a lift as well as stairs.
The pedestrian bridge allows people on both sides of the track to access the station while improving safety and enabling more frequent trains in the future.
When the new bridge opens on Monday 24 August, the temporary scaffold bridge will be permanently closed.
Latest updates
The new pedestrian bridge will open on Monday 24 August 2026. From this date, the temporary scaffold bridge will be permanently closed.
Following the opening of the new bridge:
- Bike parking will be available in its current location.
- Planning is underway for new mobility parking.
- We plan to install weather protection (canopies) and anti-throw screens later this year during a planned rail closure. We’ll keep you updated on timing.
The new pedestrian bridge at the station is soon to be completed in the following months.
Check out the videos for some work the team have done over the past 30 days.
Access changes to Te Mahia Station from 29 January until project completion
One temporary access point to the station platform will be available from Great South Road, using the stairs.
There is no pedestrian access from Ferguson Street to the train station. We’ll have signs in place to show you the best way to access the station.
If you need help, a mobility taxi service is available
We have arranged a free mobility taxi service for Te Mahia station for customers with accessibility issues.
The mobility taxi will be available all day, 7 days a week.
The taxi service will be available from 29 January until mid 2026. It will not be available on Waitangi weekend (6 to 8 February) during the full network closure.
The service can be boarded from bus stop 2420 on Great South Road and will take you to any station between Papakura and Manurewa.
To book, mobility customers will need to call 0800 025 999 or 0800 026 999 (Ref: Mobility Shuttle). This phone line is manned Monday to Friday 7am to 6pm, and weekends 9am to 5pm. Outside these hours call 027 688 9024 or 021 242 6261.
Project designs
Final render for Te Mahia Station pedestrian bridge
Community feedback
Project benefits
Safer journeys for everyone
Supports more frequent trains
Reduced travel delays
Better station accessibility
Project background
In May 2025 we shared our preferred design with customers, the community, and stakeholders. We asked for feedback to ensure this new infrastructure will tie in with the existing community and village.
Specifically, we asked for feedback on:
- access and connection
- safety
- bike facilities
- any other local insights.
To see the page we used to engage with the community, go to Safer access to Te Mahia Station Station is coming (opens in a new tab).
We heard it makes sense to remove the level crossing and replace it with a pedestrian bridge. We also heard that the new bridge should be fully accessible, safe and connected.
Concerns were raised about anti-social behaviour and personal safety at this station. In particular, the possibility of people throwing items off the bridge onto the platform or neighbouring properties.
We also heard that it can be difficult to access the station for people needing to be dropped off from Great South Road, along with the need to focus on safety improvements along the Ferguson Street accessway.
Other feedback made comments about graffiti and planting within the plaza area of the station (along Great South Road).
The idea of incorporating more artwork and beautification at Te Mahia Station was raised by several community members. Suggestions included adding a mural or a piece of cultural artwork to enhance the space. People also noted that such features could help deter graffiti and contribute to a more welcoming and well-maintained environment.
We explored opportunities for mahi toi (cultural artwork) at the station in partnership with mana whenua. While they chose not to pursue this at this time, we remain open to future collaboration when the time is right.
During the consultation, we:
- delivered 11,926 flyers
- had face to face conversations with the occupants of 12 surrounding properties
- held 4 customer engagement sessions at Te Mahia Station
- held 2 engagement events with about 40 people in person (about both Te Mahia and Takaanini stations)
- held stakeholder presentations
- engaged with Manurewa Local Board and Ward Councillors
- engaged with mana whenua
- engaged with the Capital Projects Accessibility Group (CPAG)
- engaged with one school
- received and analysed 165 insights (36 responses to our Have Your Say webpage).
Most feedback we received was consistent with the project delivery goals
Lifts will be installed with a regular maintenance schedule and operational procedure in place for any breakdowns. An alternative accessible exit will be available during emergency situations.
Lifts will have capacity for 26 people. Prams, e-bikes, courier bikes, wheelchairs and mobility scooters can comfortably use these.
The bridge will be constructed from concrete and provide stair and lift access, non-slip surfaces and design standard tactiles for low vision customers.
The width of the stairs and bridge is confirmed to be 2.5m, allowing space for people to pass and travel in both directions.
Well-designed bike access ramps on stairs will be 180mm in width (wide enough for all bike tires) and designed with space away from handrails.
The design of the pedestrian bridge will be future proofed to allow for the fourth tracking of the southern rail line and for e-gates to be introduced in the future.
Lighting and security (including CCTV), emergency alarm help points, and lighting on and around the pedestrian bridge are all included in the design and will be confirmed before construction.
Clear wayfinding signage will be included to help people navigate the area.
Changes we're making because of the feedback
We listened to your feedback and we will:
- add anti-climb, throw and jump screens as a core safety feature in the final design
- confirm that safety improvements for the Ferguson Street accessway will be made
- include weather protection such as canopies in the final design.
How we're addressing other feedback we heard
The following investigations and designs are underway through the First and Final Leg (FFL) and Public Transport Safety and Amenity (PTSA) programmes:
- reviewing drop-off and pick-up areas
- investigating more secure bike storage at the station (and more broadly across Auckland)
- reviewing whether more AT HOP card readers or gate lines are needed.