Changes to Pukekohe Bus Services Changes to Pukekohe Bus Services

Pukekohe bus changes from Sunday 10 March 2024

  • Extension to route 392 to give a bus service to the Belmont sub-division
  • 391, 392, 393, 394, 396 timetable changes including some reduction in peak frequency.

 

392 route change

  • Route 392 (PUKEKOHE NORTHWEST LOOP)
    • Route has been extended by 2.5 kilometres
    • There will be two new bus stops:
      • Taikaranga St by Tamaoho School
      • 209 Victoria St West by Jutland Road
    • All bus stops currently served by the bus will continue to be served.

 

Route 391, 392, 393, 394 and 396 timetable changes and reduction in peak frequency

For the duration of the Pukekohe to Papakura (P2P) rail closure peak frequencies of 391, 392 and 393 buses will be reduced to align better with the 394 (rail replacement bus) and each other. These will now be running every 30-minutes, the same as the all-day frequency. The other timetable changes for the 391, 392, 394 and 396 buses are to provide better connections with trains and other buses.

  • Route 391 (PUKEKOHE NORTHEAST LOOP) timetable changes and peak frequency change from 20 minutes to 30 minutes to improve connections with the 15-minute frequency of the 394 rail replacement bus.
  • Route 392 (PUKEKOHE NORTHWEST LOOP) timetable changes and peak frequency change from 20 minutes to 30 minutes to improve connections with the 15 minute frequency of the 394 rail replacement bus. Its route has also been extended (see above).
  • Route 393 (PUKEKOHE SOUTH LOOP) timetable changes and peak frequency change from 20 minutes to 30 minutes to improve connections with the 15 minute frequency of the 394 rail replacement bus.
  • Route 394 (PUKEKOHE STATION TO PAPAKURA STATION VIA PAERATA RISE) minor timetable changes to improve connections with the train at Papakura and with other buses at Pukekohe.
  • Route 396 (WAIUKU, PATUMAHOE, PUKEKOHE STATION) minor timetable changes to improve connections with other bus services.