Results for "2公里后验加平北路有250米拥堵"
Found 99 matches
page 1 / 10
-
Bushlands Park Drive, Albany – P120 parking restrictions
Proposal status: Feedback closed 8 June 2020, last updated 11 December 2020. Reference number: RTV-304 In June 2020, we proposed changes in your area To increase parking turn-over in the area, we proposed P120 (2 hour) parking time restrictions along one side of Bushlands Park Drive in Albany. Our proposal was in response to requests from residents through the Local Board. Currently... of traffic and visibility in both directions (will still exist for 2 hours). Part
-
Triangle Road & Makora Road, Massey - Intersection improvements
intersection with 13 crashes reported from 2014 to 2018, 2 of which resulted in serious injury... is a high-risk intersection with 13 crashes reported from 2014 to 2018, 2 of which resulted in serious... Road is a high-risk intersection with 13 crashes reported from 2014 to 2018, 2 of which resulted... to 2018, 2 of which resulted in serious injury. This crash rate is worse than 90% of other similar... traffic lights and 2 new crossings at the intersection of Makora Road and Triangle Road, Massey. Our
-
Coatesville Riverhead Highway, Coatesville – P5 loading zone
Proposal status: Feedback closed 21 May 2020, last updated 7 July 2020. Reference number: RTV-292 In May 2020, we proposed changes in your area To improve road safety, we proposed to convert two parki…
-
Public Transport fares rise for first time in two years
Date: 15 March 2023 Public transport fares in Auckland will rise by around 6.5% from 2 April 2023. The fare increase, which is the first in two years, will add no more than 20 cents per journey while half price fares remain in place. Auckland Transport (AT) Interim Chief Executive Mark Lambert says the average increase has been kept below inflation and operating cost increases. “The cost of operating a bus, train, or ferry service has increased significantly since 2021. “However, with multiple
-
Auckland Transport simplifies fare structure and announces annual adjustment
Date: 17 January 2025 Starting 2 February, Auckland Transport is simplifying its zone systems and fare structure across buses, trains and ferries – the biggest change since 2016. There will be fewer zones to simplify the system, which will also result in fare decreases for some travellers... says. Fare system changes to benefit those who travel the furthest across Auckland On February 2 ... or contactless payments travelling from the Hibiscus Coast to go to Albany, from 2 February
-
Roadworks affecting public transport as of 2/06/2025
Cryers Road, East Tamaki – Weekdays, Monday 2 June to Sunday 13 July 2025 Dates: Weekdays, from Monday 2 ... Stop 3172 – Saint Clair Place East Coast Road, Browns Bay – Monday 2 & Tuesday 3 June 2025 Dates: Monday 2 & Tuesday 3 June 2025Time: 8pm to 5amDescription: Bus stop closures are required due... to Thursday 19 June 2025 Dates: Monday 26 May to Thursday 19 June 2025Time: 10am to 2 :45pmDescription... Bus Stop at 68 Finlayson Avenue Monday 2 to Friday 6 June: Stop 6873 – Bundena Place Temporary
-
Layout 2
One-way cycle lane on both sides of the road with parking retained on one side. A physically separated one-way cycle lane on both sides of the road, with parking spaces retained on one side of the road, between the cycleway and the traffic lane. Where the cycle lane crosses a driveway, a small speed cushion will be installed parallel to the road, so vehicles can still get through while ensuring safety for people on bikes. Download consultation plans for layout 2 locations (PDF 5.7MB). Merton
/projects-initiatives/redirect-pages-do-not-unpublish/links-to-glen-innes-cycleways-old2/layout-2
-
King’s Birthday rail closure - Critical upgrades to prepare for CRL
Date: 27 May 2025 Major rail upgrades to bring more frequent and reliable services mean no trains will be running from Friday 30 May to Monday 2 June, say Auckland Transport and KiwiRail. The work is happening across the Auckland rail network to get ready for the opening of the City Rail Link (CRL) in 2026. This four-day closure is part of KiwiRail's ongoing Rail Network Rebuild programme. AT and CRL Limited also have work underway this weekend while trains aren’t running. No trains
-
List of school speed limits - Phase 2
During Phase 2 of Safe Speeds consultation in 2021, Auckland Transport proposed safe speed limits around 57 Auckland schools. We have taken all feedback into consideration and the Board of Directors of Auckland Transport (AT) has amended the Speed Limits Bylaw 2019. Schools with new speed limit Rural schools are not listed here. North Auckland Hauraki Primary Long Bay School & Long Bay... Waatea School See full list of speed limit changes from Phase 2 . For more information, please see FAQs
-
Roadworks affecting public transport as of 2/04/2024
Finlayson Avenue, Clendon Park – Tuesday 2 April 2024 Dates: Tuesday 2 April 2024Time: 9am.../Roberton Road Stop 8138 – Fairlands Avenue 18 Henwood Road, Mangere – Tuesday 2 April 2024 Dates: Tuesday 2 April 2024Time: 7am–7pmDescription: A bus stop closure is required due to roadworks... Karangahape Road, CBD – Friday 29 March to Tuesday 2 April 2024 Dates: Friday 29 March to Tuesday 2 ... Temporary Bus Stop at 58 Namata Road 295 New North Road, Mount Albert – Tuesday 2 April 2024 Dates