Long-term road repairs from Auckland storms Long-term road repairs from Auckland storms

Repairing the damage to our local roads sustained during the 2023 flooding and cyclone events

During the storm events of 2023, more than 2,000 slips and roading issues were reported across the Auckland region. The flood repair programme is expected to take 2 to 3 years to complete and will cost $390 million.

Reported sites and slip repairs 

  • Total number of sites: 2,000+
  • Small issues and slips resolved quickly: 1,200
  • Sites needing minor to major repairs: 800+

Of the 807 minor and major repairs needed, 604 have been completed to 30 September 2024 (74%).

215 of the 807 sites are categorised as major (costing over $250,000). 123 of the 215 (57%) are now completed.

592 of the 807 sites are categorised as being minor (under $250,000). 481 of the 592 (81%) are now completed.

This month we have 29 sites in construction:

  • 22 are major
  • 7 are minor.

Auckland Transport flood recovery numbers as of October 2024.

The number of sites needing minor to major repairs may change slightly over time as the design and investigation of each site develops.

For details on this month’s progress across the regions, check out our October 2024 report.

You can also find information on major road repairs in your community under the following regional sections.

Divider image.jpg

Aotea flood recovery progress

Progress of the repair work in Great Barrier Island. 

Divider image.jpg

Central Auckland flood recovery progress

Progress of the repair work in Waikowhai.

Divider image.jpg

East & South Auckland flood recovery progres

Progress of the repair work in Karaka, Awhitu, Patumahoe, Hunua, Howick, Mellons Bay.

Divider image.jpg

Gulf Islands flood recovery progress

Progress of the repair work in Waiheke and Rakino. 

Divider image.jpg

North Rural Auckland flood recovery progress

This page lists updates on the progress of the slip repair work in North Rural Auckland. 

Divider image.jpg

North Urban Auckland flood recovery progress

Progress of the repair work in Orewa, Hobsonville, North Shore, Whangaparaoa.

Divider image.jpg

West Auckland flood recovery progress

Progress of the repair work Piha, Karekare, Titirangi, Laingholm, Waiatarua, Green Bay, Muriwai, Te Henga, Waitakere, and other west locations.

Divider image.jpg

Electronic flood alert pilot programme

Following the extreme weather events of early 2023, Auckland Transport (AT) is testing an electronic flood alert system at 3 key sites across Auckland.

We ask for your patience, as sites across the region have sustained significant damage. Locations that have the highest risk, safety needs or are the only access route to a community are being prioritised for attention.

In some locations, we’ve been able to provide a temporary fix, such as one-lane access for residents or the wider community, until we can permanently rebuild the road.

We understand that road damage causes inconvenience to residents, due to detours and road closures. We want to reassure the community that we’ve deployed as many resources as we can, including additional contractors to work on these sites, but some roads will take time to fully repair.

If there are roading issues with a potential safety risk (for example, new slips, cracks in roads, flooding, or trees falling over roads or cycleways), call 09 355 3553 or report the problem online.


Flood recovery updates

Auckland-wide news about long-term repairs 

Road repair process and slips

Contact us