Results for "2公里后验加平北路有250米拥堵"
Found 99 matches
page 7 / 10
-
Paerata Road and Crisp Avenue, Pukekohe - Broken yellow lines
broken yellow lines aim to increase visibility and safety at the intersection and include removing 2 ... sides. Request to limit parking on Paerata Road to P120 (2 hour parking). We will request our... on Paerata Road. Belief that this will remove 5 spaces, not 2 . It is illegal to park within 6 metres... with this proposal to be 2 excluding the intersection 6 metre rule. Next steps These works
-
Pilot exemption pack
. Navigation Bylaw 2021 2 . Harbourmaster’s Direction 2 -20: Vessel Operating Requirements (PDF 137KB) 3
/boating-marine/harbour-rules-regulations/pilot-exemption-pack
-
Plan ahead when travelling through AMETI Eastern Busway
and approach roads and install traffic barriers, footpath, and cycle lanes. Stage 2 (the cutover of the high-pressure Hunua 2 bulk transmission water main) is the primary set of works during this time
/about-us/news-events/plan-ahead-when-travelling-through-ameti-eastern-busway
-
Technology strategy
. About the technology strategy Published 2 September 2016. Read all updates. The Technology... Strategy (PDF 3MB, 32 pages) Archive 2 September 2016 The June 2016 Technology Strategy was uploaded
/about-us/our-role-organisation/corporate-plans-strategies/technology-strategy
-
Rodney, North Auckland Group 1 – Rural signage & road marking changes
for Cluster 1 (PDF 10.5MB) Cluster 2 - Kaipara Flats Road, Woodcocks Road, West Coast Road Download the proposal drawing for Cluster 2 (PDF 7.4MB) Cluster 3 - Leigh Road Download the proposal drawing
-
Titirangi Road, Titirangi – Parking changes
to Sunday. P2 (2 minute parking): 8am to 9am, Monday to Friday, School days only. Existing bus stop (to be relocated): Bus stop: 2 :45pm to 3:15pm, School days only. P60 (1 hour parking): At all other
/about-us/have-your-say/west-auckland-consultations/titirangi-road-titirangi-parking-changes
-
Alfriston Rd and Alfriston-Ardmore Rd, Manurewa - Intersection upgrade
Suggestion that Alfriston-Ardmore Road be widened to allow for 2 lane stacking capacity... as 2 lanes and further design work around this approach is not required. Request that the speed limit
-
Upgrading our streetlights
. Stage 2 Stage 2 of the streetlight retrofit was approved in April 2018 and will replace an additional
-
Parking reviews
up or down to get closer to the 85% target. We do 2 levels of price reviews. 1. Specific paid parking... by cars looking for a parking space. 2 . Annual price reviews New hourly rates are applied in existing
-
Bucklands Beach safety improvements
the design to make it cheaper and less disruptive to traffic. We revised the proposal into 2 stages... construction costs and impact. We expect to save at least $200,000, which we will use for Stage 2 improvements. Stage 2 We will use savings from Stage 1 to fund more crossings on The Parade and its side roads... submissions 2 email submissions 26 public meeting comment cards. The proposed changes received... Road and The Parade installing 2 speed bumps at 74 and 66 The Parade installing a raised zebra
/projects-initiatives/east-auckland-projects-and-initiatives/bucklands-beach-safety-improvements