Results for "zorrohours 2"
Found 98 matches
page 8 / 10
-
Carpooling on-ramp priority lanes
Priority lanes are on-ramp lanes heading onto the motorway where vehicles with 2 or more people can bypass the ramp signal. Priority lanes can also be used by buses, trucks, and motorcycles. The lanes encourage car-sharing and the use of public transport, helping move more people and reduce the number of vehicles on the road. Priority on-ramp lanes are managed by the NZ Transport Agency (NZTA). From 6 to 20 March 2017, NZTA is running a trial that allows electric vehicle drivers access
-
Avondale Town Centre footpath improvements
which is under the pavement. Stage 2 of the paving replacement will commence once the power supply... with the Business Association to notify business owners. Project Update Stage 2 was completed in 2022
-
Shuttles & other services
to 10km $5.00Zone 2 10 - 20km $7.40Zone 3 over 20km $10.00 Areas included in Zone 1: Blockhouse Bay..., Oratai, Woodlands Park, Ranui. Areas excluded in Zone 2 : Huia, Muriwai, Karekare, Piha, Kumeu
-
Step 3: Apply for Corridor Access Request (CAR)
, footpath or berm, you need a CAR. Check if you need a Corridor Access Request. Step 2 . What to include... the process for work completion notice. Check if you need to notify AT after a 2 -year warranty period.
/about-us/working-on-the-road/corridor-access-requests/step-3-apply-for-corridor-access-request-car
-
Redoubt Road dynamic lanes go live Monday 9 November
To reduce congestion, Auckland Transport (AT) has installed dynamic lanes on Redoubt Road in Manukau, between the Southern Motorway offramp and Hollyford Drive. Dynamic lanes use overhead signs and on road lights to change the direction of centre lanes at peak times, improving traffic flow. This coming Monday 2 November, the overhead signals will switch on, but the lanes will stay the same... will be unchanged until the ‘go live’ date on November 9. Timeline Monday 2 November: The overhead
/about-us/news-events/redoubt-road-dynamic-lanes-go-live-monday-9-november
-
Mairangi Bay Town Centre safety improvement updates
through the area, to follow the detour in place. 2 March Works starting in Mairangi Bay The work... March 2020. This duration allows for bad weather etc Site 2 - Concrete speed table, drainage, footpath
-
East Tamaki Road, Otara – Driveway safety improvements
. These changes included: 2 new speed bumps to reduce drivers speeds when entering or exiting the driveway. The speed bumps will be inside the shared driveway, which is the safest position. 2 “watch for driveway
-
Cycle network map stockists
Lynn Train Station - 2 Clark Street, New Lynn Newmarket Train Station - 48 Remuera Road (opposite... Premier Avenue AT Lobby - 20 Viaduct Harbour Avenue, Auckland City Centre Auckland Hospital - 2 Park Road... Drive iSite Princess Wharf - Shop 2 , Shed 19, 137 Quay Street iSite SkyCity - Corner of Victoria... - 42 Nuffield Street Parnell Library - 545 Parnell Road, Parnell Power to the Pedal - 2 Waterloo... Citizen's Advice Bureau (CAB) Hibiscus Coast - 40 to 46 Ōrewa Square Devonport Library - 2 Victoria Road
/cycling-walking/cycling-walking-paths/cycle-network-map-stockists
-
Victoria Avenue and Manawa Road, Remuera - Broken yellow lines
of the white painted lines on Victoria Avenue by up to 2 metres (in front of 209 and 203, loss of 2 ... out movements, with 2 of these crashes resulting in injury. This crash data is provided from... start to park there from Victoria Avenue. 2 ) outside 228 Victoria Ave; 2 parking spaces removed. 3... white parking lines allowing for only one vehicle outside 3 Manawa Road as 2 cars cannot fit. Parking
-
Board reports 2020
- Tranche 2 (PDF 398KB) 13.1 Whirinaki Our blueprint for building trust confidence and mana (PDF 234KB... Attachment 1 Census Analysis (PDF 834KB) 14.1 Attachment 2 Census Analysis (PDF 6.2MB) 14.2... 3.4MB) 14.3 Attachment 2 - Kia Ora Tāmaki Makaurau (PDF 689KB) AT Board Meeting Closed Agenda (PDF... - Process summary, glossary and assessments (PDF 3.1MB) Item 11.1- Attachment 2 - Amendment Bylaw (PDF 375KB... - Attachment 2 - Annual Report (PDF 4.5MB) Item 12.2 - People Highlights (PDF 350KB) Item 12.2