Results for "train timetable"
Found 96 matches
page 5 / 10
-
Event transport
-
Auckland’s local road network coping well – no significant closures overnight
Date: 13 February 2023 Auckland’s local road network is coping well with no significant road closures overnight as ex-Cyclone Gabrielle nears, however train services remain suspended across Auckland and there are substantial changes to ferry timetables, Auckland Transport says. Scheduled bus services are running across the region, but there will be some delays, detours and cancellations across the network depending on weather conditions today. For schools which are open we have been working
-
New trains arrive ahead of City Rail Link
the city’s growing passenger rail network. AT is expanding its train fleet to 95 units over the coming months.... “Auckland will soon have five new train stations – three south of Papakura and another two in the city... to Pukekohe Station, which is set to re-open next year. “Catching the train will be a better option for even... as 3-carriage units at AT’s train depot in Wiri. The first of the 23 new trains arrived in July and the latest two are on their way to the Wiri train depot. They are expected to be in service next year
/about-us/news-events/media-centre/2024-media-releases/new-trains-arrive-ahead-of-city-rail-link
-
End of the line in sight for Auckland’s diesel commuter trains
KiwiRail and Auckland Transport (AT) are suspending the passenger train service that connects Papakura and Pukekohe from September 2022 until the second half of 2024, to allow for the work needed to extend the electric train service to Pukekohe. The announcement comes as work picks up to ready Auckland’s rail network for the opening of the City Rail Link (CRL) in late 2024. The service... has agreed to replace the ageing Papakura – Pukekohe diesel shuttle service train with buses from
/about-us/news-events/end-of-the-line-in-sight-for-auckland-s-diesel-commuter-trains
-
Aucklanders urged to plan ahead with train services disrupted and Harbour Bridge closures possible
Date: 2 July 2023 Auckland Transport is advising Aucklanders to plan ahead before they travel on Monday with significant disruptions affecting Southern and Eastern Line train services. Due to an issue with KiwiRail’s electrical infrastructure between Puhinui and Ōtāhuhu, all Eastern Line services... between Manukau and Ōtāhuhu. Scheduled bus services across Auckland will also accept train tickets as well...; Whether train and ferry services are able to continue operating if wind speeds across Auckland reach
-
Peak train services to run every 20 minutes from tomorrow as industrial action continues
Date: 9 June 2024 All train services at peak times will be running at a reduced frequency from tomorrow due to ongoing industrial action by unionised Auckland One Rail (AOR) staff. Auckland Transport (AT) is advising commuters to plan ahead as peak train services will only be operating every 20 minutes. AT’s rail operator AOR is running a reduced timetable to cover a shortage of train staff due to industrial action, which began on Saturday, 8 June. We currently do not know when
-
Make a plan to travel home early ahead of today’s heavy rain
this morning, as well as significantly lower passenger levels on our bus, train and ferry services... it can pose a series risk to your health and safety. Public transport situation report Train Due to the severe weather, there have been multiple slips on Auckland’s train network. KiwiRail, the track maintainer, are working hard to carry out urgent repairs. Due to work on the tracks, train speeds... Newmarket and Otahuhu on the Southern Line. Services will continue to run to the timetable but may
-
Student travel
Student travel information for Primary, Secondary and Tertiary students. Find out about concessions, school bus timetables and getting to and from school or campus. You may also be interested in: AT Mobile app Real time board Top up AT HOP card Bus & train fares Ferry fares
-
Expect delays on Wednesday as we ensure our network is safe after tonight’s heavy rain
. “To make sure that we’re keeping our passengers safe our train and ferry services will both... about road closures. Public transport situation report Train Due to the severe weather, there have been multiple slips on Auckland’s train network. KiwiRail, the track maintainer, is working hard... of high winds and heavy rain. See the AT website for the latest information about ferry timetable
-
Major rail upgrades during extended Labour Weekend closure
Date: 20 October 2025 Major rail upgrades to enable more frequent, reliable trains and create safer access to train stations will be carried out during an extended Labour Weekend rail closure... pedestrian bridges at three stations to improve safety as train frequencies increase. “We're grateful... stop at or near all train stations on all lines – Southern (RBS), Eastern (RBE), Western (RBW...; Ongoing construction of new Southern Line train stations in Drury. Renewing