Results for "6"
Found 99 matches
page 2 / 10
-
Health and Safety requirements
ConstructSafe All AT construction contractors are required to be registered and operating the ConstructSafe Tier 1competency assessment framework for any construction category contracts. From 1 May 2019, AT will be initialising the ConstructSafe Tier 2 competency assessment framework which comes with a 6 month phase in period. Please see here for more details: AT ConstructSafe Principal's Requirement (PDF 1.2MB). ConstructSafe Competency Assessment Framework Plan (PDF 567KB). ConstructSafe
-
Timetable improvements for the 395 and 396 bus services
New 395 timetable from Monday 20 April From Monday 20 April, the 395 bus service between Waiuku, Glenbrook, Kingseat and Papakura will have two extra trips. Buses will leave Waiuku at 5:20am 6 :20am 7:20am Buses will leave Papakura Station at 5:33pm 6 ... 080. Visit the AT Customer Service Centre at Papakura Station, open on weekdays (6 :30am – 7pm
/bus-train-ferry/service-announcements/timetable-improvements-for-the-395-and-396-bus-services
-
Cryers Road, East Tamaki - Broken yellow lines
. The proposed broken yellow lines have been extended from 6 Cryers Road to the first driveway on Echelon... and exiting 6 Cryers Road. We are happy to hear that our proposal will improve driver safety in the area. Request to extend broken yellow lines from 6 to 10 Cryers Road and to the first driveway on Echelon... are uninterrupted between 6 and 10 Cryers Road. In addition to discouraging unsafe crossings, this will also improve visibility for vehicles entering and exiting the driveway of 6 and 10 Cryers Road. Concern
/about-us/have-your-say/south-auckland-consultations/cryers-road-east-tamaki-broken-yellow-lines
-
Motorcycle and scooter parking
numbers: Outside 22 Jellicoe StreetOperating times: At all timesSpace available (in metres): 6 ... (in metres): 6 Location and street numbers: Outside ASB BankOperating times: At all timesSpace available... numbers: Outside 12 Madden StreetOperating times: At all timesSpace available (in metres): 6  ...: P180, at all times.Space available (in metres): 6 Pakenham Street West Location and street numbers... to 50 Sale StreetOperating times: At all timesSpace available (in metres): 6 Saint Paul Street
/driving-and-parking/motorcycles-and-scooters/motorcycle-and-scooter-parking
-
Roberts Avenue, Bayswater – Broken yellow lines
on the north side of the road. Additional broken yellow lines between 4 & 6 Roberts Ave driveways. White... lines to between properties 4 and 6 as this kerb space is not wide enough to accommodate parking... appropriately. Next steps This work will happen in with the next 6 months, but we will let you know
/about-us/have-your-say/north-auckland-consultations/roberts-avenue-bayswater-broken-yellow-lines
-
Cape Horn Rd & Hillsborough Rd, Waikowhai - Road safety improvements
visibility. From multiple site observations and crash analysis, AT has identified driveways of 4A and 6 ... of Cape Horn Road is quite a distance from the driveways of 4A and 6 Cape Horn Road. Due to high... effects on visibility. AT has proposed broken yellow lines outside driveways of 4A and 6 Cape Horn Road... visibility at vehicle crossing of 4A and 6 and reduced speeds entering Cape Horn Road. Respondents
-
Classroom activities for Travelwise
card 4 - Letter to the Principal (PDF 314KB) Activity card 5 - Postcard (PDF 410KB) Activity card 6 ...) Activity card 5 - Venn diagram (PDF 240KB) Activity card 6 - Jobs and health (Junior) (PDF 197KB
-
Kell Dr, Albany - Broken yellow lines
Consultation status: closed 6 April 2018 Proposal reference: BYL-228 We are proposing to install broken yellow lines (no stopping at all times parking restrictions) on both sides of the eastern end of Kell Drive, including the removal of approximately 6 parking spaces. Download the consultation drawing for Kell Drive (PDF 456KB) We are proposing these changes as vehicle accessibility is currently being restricted by cars parked on the east end of Kell Drive. Feedback The proposal received mixed
/about-us/have-your-say/north-auckland-consultations/kell-dr-albany-broken-yellow-lines
-
Sunset Road, Unsworth - Broken yellow lines
Proposal status: closed 11 September 2018 Reference number: BYL-317 We're proposing changes in your area We are proposing broken yellow lines on Sunset Road in Unsworth, including new road markings around the existing southbound bus stop. This proposal involves the removal of 6 on-street car parks. Download the proposal drawing for Sunset Road, Unsworth (PDF 223KB). Why the changes are needed... speeds. Next steps This work will be implemented between 6 and 12 months, and we will let you know
/about-us/have-your-say/north-auckland-consultations/sunset-road-unsworth-broken-yellow-lines
-
Ada Street, Remuera - Broken yellow lines
Proposal status: closed 6 September 2018 Reference number: BYL-315 We're proposing changes in your area We are proposing to extend current 'No stopping at all times' lines on Ada Street in Remuera by 6 metres and to remark the yellow limit line, which will result in the loss 1 parking space. Download the proposal drawing for Ada Street (PDF 679KB) Why the changes are needed These changes will improve access into the street for larger vehicles, such as emergency vehicles and waste trucks
/about-us/have-your-say/central-auckland-consultations/ada-street-remuera-broken-yellow-lines